ASDC has a contract to produce eight satellites to support a worldwide telephone system that allows...

ASDC has a contract to produce eight satellites to support a worldwide telephone system that allows individuals to use a single, portable telephone in any location on earth to call in and out. ASDC has estimated that the R&D costs will be USD $1,000,000. Material costs are expected to be $500,000. They have estimated the design and production of the first satellite will require 100,000 labor hours and a 90 percent improvement curve is expected. Skilled labor cost is $30 per hour. Desired profit for all projects is 25 percent of total costs. Answer the following questions. You may use excel

a) How many labor hours should the eighth satellite require?

b) How many labor hours for the whole project of eight satellites?

c) What price would you ask for the project? Why?

d) Midway through the project your design and production people realize that an 85 percent improvement curve is more appropriate. What impact does this have on the project?

0 0
Add a comment Improve this question Transcribed image text
Answer #1

(a) Labout hours needed by nth unit

Tn = T1 * ( n)b where b = log ( learning rate) / log2

T8 = 100000 x (8)b where b =-0.152

T8 = 100000 x (8)-0.152 = 72900

(b) T1 to T8

100000 [ 1+ 0.9+(3)-0.152 + (4)-0.152 + (5)-0.152+ (6)-0.152 + (7)-0.152 + (8)-0.152]

100000x [ 1.9+ 0.8462+0.81+0.7829+0.7615+0.7439+0.729]

= 6.57355 x100000 = 657355

(c) Total cost =1.25 x  [production cost + material cost + research and develpment cost]

= 1.25 x [ 657355 x30 + 500000+1000000]

= 26525821

(d) If an 85% learning curve is expected, it means that the number fo hours expected to complete the units will be lesser than that in 90% LR. Therefore the cost estimation need to be revised and will be lesser than value with 90%LR

Add a comment
Know the answer?
Add Answer to:
ASDC has a contract to produce eight satellites to support a worldwide telephone system that allows...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • just part E please Norwegian Satellite Development Company (NSDC) Cost Estimates for World Satellite Telephone Exchange...

    just part E please Norwegian Satellite Development Company (NSDC) Cost Estimates for World Satellite Telephone Exchange Project NSDC has a contract to produce 7 satellites to support a worldwide telephone system (for Alaska Telecom, Inc.) that allows individuals to use a single, portable telephone in any location on earth to call in and out. NSDC will develop and produce the 7 units. NSDC has estimated that the R&D costs will be NOK (Norwegian Krone) 15,000,000. Material costs are expected to...

  • help 13 Able Manufactucing has an opportunity to bid on a contract to produce Able could'use...

    help 13 Able Manufactucing has an opportunity to bid on a contract to produce Able could'use excess assembly capacity at its main production lacility. The contra -delivery (within two years) of 30,000 units. Able's melhods engineers suggest an -consisting of nine tasks: ari electronic assembly assembly line Performance time (minutes) Must precede Task C, e A, B, F Assembly would occur on one shift, with aveoge productive time of 7', hours per (allowances for breaks, fatigue, shutddwns, etc.). There would...

  • Zando Pharmaceuticals is an affiliate of the German-based Heisenberg Corporation, which employs 40,000 worldwide. Zando’s St....

    Zando Pharmaceuticals is an affiliate of the German-based Heisenberg Corporation, which employs 40,000 worldwide. Zando’s St. Louis facility houses the U.S. corporate headquarters and Research and Development (R&D). It produces 30 products, using 28 different batch processes. The facility has 2,000 employees on-site. In recent years, Zando’s profitability has suffered, which can be attributed to increased competition, customer dissatisfaction, and regulatory pressures. Luis Alvarado, president of Zando, called a meeting to consider ways to improve profitability. He labeled the meeting...

  • Zando Pharmaceuticals is an affiliate of the German-based Heisenberg Corporation, which employs 40,000 worldwide. Zando’s St....

    Zando Pharmaceuticals is an affiliate of the German-based Heisenberg Corporation, which employs 40,000 worldwide. Zando’s St. Louis facility houses the U.S. corporate headquarters and Research and Development (R&D). It produces 30 products, using 28 different batch processes. The facility has 2,000 employees on-site. In recent years, Zando’s profitability has suffered, which can be attributed to increased competition, customer dissatisfaction, and regulatory pressures. Luis Alvarado, president of Zando, called a meeting to consider ways to improve profitability. He labeled the meeting...

  • Case 27 To Use or Not to Use? Beaufort Sea Production Company (BSPC) operates a medium-sized...

    Case 27 To Use or Not to Use? Beaufort Sea Production Company (BSPC) operates a medium-sized oil field on Alaska’s north coast. The field is still producing at its maximum rate, 325,000 barrels of oil per day (BOPD). However, to sustain this rate the company started a waterflood of the reservoir two years ago. Now a capacity bottleneck in the water disposal process is threatening to curtail production. In waterflooding, salt water from the Beaufort Sea is treated to remove...

  • Summary should briefly analyze the central problems and issues of the case and provide some analysis...

    Summary should briefly analyze the central problems and issues of the case and provide some analysis and suggestions. Thank you. Lean Initiatives and Growth at Orlando Metering Company It was late August 2002 and Ed Cucinelli, vice president of Orlando Metering Company (OMC), sat in his office on a late Saturday morning. He had come in to prepare for some strategic planning meetings that were scheduled for the upcoming week. As he noticed the uncommon silence in the building, Ed...

  • How can we assess whether a project is a success or a failure? This case presents...

    How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT