Matrix V
Matrix W
Matrix X
Matrix Y
Matrix Z
A manufacturing company with two plants...
A manufacturing company with two plants in different locations produces guitars, banjos, and ukuleles. The production costs for each instrument at each plant location are shown in the matrices below. If materials increase by 15% and labor costs increase by 12% for all instruments at both plants, which matrix, V, W, X, or Z, shows the average cost of production for each type of instrument at each plant location'? PLANT1G Banjos Ukuleles Materials 30.00 25.00 10.00 Labor 60.00 60.00 10.00 MATRIX V Guitars Banjos Ukuleles Materials 34.81 27.73 10.62 Labor66.08 $ 61.60 10.64 PLANT 2 Guitars Banios Ukuleles Materials 29.00 22.008.00 Labor58.00 50.00 9.00 MATRIX W Guitars BanjosUkuleles Materials 33.93 $ 27.03 10.35 Labor 66.08 $ 61.60 $ 10.64 MATRIXX Guitars Banjos Ukuleles Materials 34.22 $ 27.26 $ 10.44 Labor 65.49 $ 61.05 $ 10.55 MATRIX Y Guitars Banjos Ukuleles Materials 32.45 $25.85 9.90 Labor66.67 62.15 $ 10.74 MATRIXZ Guitars Banjos Ukuleles Materials 34.52 $ 27.50 10.53 Labor64.90 60.50 10.45