Calculate the minimum cost of this operation given that:
The transportation costs are $5.00 per cubic yard per mile
The cost of dumping excess material in the spoil area is $0.50 per cubic yard
The cost to excavate for the borrow pit is $1.00 per cubic yard
No more than 50,000 cubic yards can be cut from the borrow pit
Calculate the minimum cost of this operation given that: The transportation costs are $5.00 per cubic...