A | Direct Materials Used | 92150 (D-C-B) | 68400 | 130000 |
B | Direct Labour | 57000 | 86000 | 21700 (D-C-A) |
C | Manufacturing Overhead | 46500 | 81600 | 102000 |
D | Total Manufacturing Cost | 195650 | 236000 (A+B+C) | 253700 |
E | Add: Opening Work in Process | 25850 (F-D) | 16500 | 83300 (F-D) |
F | Total Cost Work in Process | 221500 | 252500 (D+E) | 337000 |
G | Less: Closing Work in Process | 36225 (F-H) | 11000 | 70000 |
H | Cost of Goods Manufactured | 185275 | 241500 (F-G) | 267000 (F-G) |
.1 T-Mobile LTE 1:37 PM E1.10 (LO 3), AN Manufacturing cost data for Copa Company are...
Exercise 1-10 Manufacturing cost data for Copa Company are presented below. Indicate the missing amount for each letter (a) through () Case B Case C Direct materials used Direct labor Manufacturing overhead Total manufacturing costs Work in process 1/1/20 Total cost of work in process Work in process 12/31/20 Cost of goods manufactured Click if you would like to Show Work for this question: $70,690 $13o $131,700 59,960 48,470 197,500 87,380 g) 85,660 107,600 258,900 d) 21,090 h) 222,350 339,500...
Exercise 14-10 Manufacturing cost data for Copa Company are presented below. Indicate the missing amount for each letter (a) through (i). Case A Case B Case C Direct materials used $ (a) $74,220 $133,200 Direct labor 62,750 91,870 (g) Manufacturing overhead 51,960 86,590 103,500 Total manufacturing costs 198,500 (d) 256,900 Work in process 1/1/17 (b) 19,610 (h) Total cost of work in process 222,320 (e) 341,400 Work in process 12/31/17 (c) 16,110 75,090 Cost of goods manufactured 190,500 (f) (i)
Exercise 1-10 Manufacturing cost data for Copa Company are presented below. Indicate the missing amount for each letter (a) through (i). Case B Case C $134,500 Direct materials used $74,150 Direct labor Manufacturing overhead Total manufacturing costs 89,180 86,850 (9) 104,100 255,200 Case A (a) 61,020 47,000 201,300 (b) 224,860 (c) 190,600 co 21,990 (e) Work in process 1/1/17 Total cost of work in process Work in process 12/31/17 Cost of goods manufactured (h) 342,900 73,060 13,380
*Exercise 19-10 Manufacturing cost data for Copa Company are presented below. Indicate the missing amount for each letter (a) through (i). Case A Case B Case C Direct materials used (a) $69,750 $132,700 Direct labor 60,800 88,330 (9) Manufacturing overhead 51,460 198,000 86,130 (d) 103,500 256,400 Total manufacturing costs Work in process 1/1/17 (b) 19,780 (h) Total cost of work in process 226,790 339,800 Work in process 12/31/17 (c) 16,170 75,070 Cost of goods manufactured 190,000
Help me solve please!
Exercise 1410 Manufacturing cost data for Copa Company are presented below Indicate the missing amount for each letter (a) through() case Л Case B Case C Direct materials used $73,000 90,820 83,050 a) $132,100 Direct labor Manufacturing overhead Total manufacturing cost Work in process 1/1/17 Total cost of work in process Work in process 12/31/17 Cost of goods manufactured 61,690 48,580 200,100 し 104,200 d) 258,300 21,220 h) 224,490 e) 338,900 c) 16,410 72,630 186,200 f)...
Exercise 2.32 Manufacturing cost data for Criqui Company are presented below: Provide the missing amounts. Case A Case B Case C Direct materials used $ (a) $70,000 $130,000 Direct labour 53,100 86,600 (g) Manufacturing overhead 46,100 81,600 101,500 Total manufacturing costs 175,600 (d) 274,000 Work in process (1/1/20) (b) 15,700 (h) Total cost of work in process 222,000 (e) 335,900 Work in process (12/31/20) (c) 13,000 90,800 Cost of goods manufactured 180,435 (f) (i)
..1 T-Mobile LTE 1:18 PM E1.8 (LO 3), AP Lopez Corporation incurred the following costs while manufacturing its product. Compute cost of goods manufactured and sold. Materials used in product $120,000 Advertising expense $45,000 Depreciatio non plant Property taxes on plant 60,000 14,000 Property taxes on store Delivery expense 7,500 21,000 Labor costs of assembly-li ne workers Sales commissio ns 110,000 35,000 Factory supplies used Salaries paid to sales clerks 23,000 50,000 Work in process inventory was $12,000 at January...
. T-Mobile LTE 1:39 PM Exit Transactions that take place on mobile phones are known as E-commerce SEM pay-per-click M-commerce Question 2 1 pts Mobile marketers often use and text messages (SMS), banner ads email, surveys snail mail, focus groups express mail, interviews . T-Mobile LTE 1:39 PM Exit is an advertising metric measuring the advertising dollars you must spend to reach 1,000 people. Cost per thousand impressions (CPM) Cost per thousand impressions (CPT) Cost per thousand impressions (CMI) Cost...
Manufacturing cost data for Oriole Company, which uses a job order cost system, are presented below. Indicate the missing amount for each letter. Assume that in all cases manufacturing overhead is applied on the basis of direct labor cost and the rate is the same. (Round overhead rate to 2 decimal places, e.g. 15.25 and final answers to 0 decimal places, e.g. 5,275.) Case A Case B Case C Direct materials used $ 40950 (a) $91,900 $63,150 58,000 142,300 (h)...
Manufacturing cost data for Orlando Company, which uses a job
order cost system, are presented below.
Indicate the missing amount for each letter. Assume that in all
cases manufacturing overhead is applied on the basis of direct
labor cost and the rate is the same. (Round overhead
rate to 2 decimal places, e.g. 15.25 and final answers to 0 decimal
places, e.g. 5,275.)
Case A
Case B
Direct materials used
$
(a)
$88,000
Direct labor
58,000
150,700
Manufacturing overhead applied...