Question

Question 6 A flood control project at Pleasant Valley dam is projected to cost $2,130,000 today, have annual maintenance cost
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Project cost = 2130000

Annual maintenance cost = 40000

Inspection cost = 220000

I = 9%

n = 8

CC = 2130000+220000*(A/F,9%,8)+40000/0.09

= 2130000+220000*0.090674+444444.444

= 2130000+19948.28+444444.44

= 2594392.72

= 2594393

Add a comment
Know the answer?
Add Answer to:
Question 6 A flood control project at Pleasant Valley dam is projected to cost $2,130,000 today,...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Question 6 A flood control project at Pleasant Valley dam is projected to cost $2,300,000 today,...

    Question 6 A flood control project at Pleasant Valley dam is projected to cost $2,300,000 today, have annual maintenance costs of $50,000, and have major inspection and upkeep after each 9-year interval costing $280,000. If the interest rate is 12%/year. Click here to access the TVM Factor Table Calculator x Your answer is incorrect. Try again. Determine the total capitalized cost. $. 1713845. Round entry to o decimal places. The tolerance is 24. Click if you would like to Show...

  • Question 2 Cecil's Manufacturing is considering producing a new product. The sales price would be $9.75...

    Question 2 Cecil's Manufacturing is considering producing a new product. The sales price would be $9.75 per unit. The cost of the equipment is $115,000. Operating and maintenance costs are expected to be $3,100 annually. Based on a 7-year planning horizon and a MARR of 12%, determine the number of units that must be sold annually to achieve breakeven. units Carry all interim calculations to 5 decimal places and then round your final answer up to the nearest unit. The...

  • Aerotron Electronics is considering purchasing a water filtration system to assist in circuit board manufacturing. The...

    Aerotron Electronics is considering purchasing a water filtration system to assist in circuit board manufacturing. The system costs $40,000. It has an expected life of 7 years at which time its salvage value will be $9,500. Operating and maintenance expenses are estimated to be $2,000 per year. If the filtration system is not purchased, Aerotron Electronics will have to pay Bay City $13,000 per year for water purification. If the system is purchased, no water purification from Bay City will...

  • Problem 2-4A (Video) (Part Level Submission) Agassi Company uses a job order cost system in each...

    Problem 2-4A (Video) (Part Level Submission) Agassi Company uses a job order cost system in each of its three manufacturing departments. Manufacturing overhead is applied to jobs on Ehe basis of direct labor cost in Department D, direct labor hours in Department E, and machine hours in Department K. In establishing the predetermined overhead rates for 2020, the following estimates were made for the year. Department D Manufacturing overhead Direct labor costs Direct labor hours Machine hours $1,170,000 $1,462,500 100,000...

  • internal project 1 anything helps! thank you!! Instructions: Study the case that starts on page 3...

    internal project 1 anything helps! thank you!! Instructions: Study the case that starts on page 3 carefully. Then write concise answers to the following questions regarding the internal control system of Duarf, Inc. Clearly label your responses with proper headings and subheadings. Be very specific and precise. Answers that appear to be beating around the bush will not get any credit. 1. What are the controls in place that under normal conditions should function well to prevent embezzlements or frauds?...

  • Questions:  For Kroger deposits in transit: What is the account titled Store deposits in-transit (refer to footnote...

    Questions:  For Kroger deposits in transit: What is the account titled Store deposits in-transit (refer to footnote 1)? This is not an account you will find on the majority of company financial statements. Why does Kroger include this account? Is it odd that this account is larger than the cash balance? How do you explain this? Information Needed to Answer Questions: Jan. 28, 2017 Jan. 30, 2016 $322 910 1,649 7,852 (1,291) 898 $ 277 923 1,734 7,440 (1,272) 790 9,892...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT