Question 6 3 pts A hypothesis test is used to prevent a machine from under or overfilling bottles of soda. On the basis of a

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Option - C) A Type I Error was made

                                                     

                                                   

                                                     

                                                                  

                                                         

                                                       

                                               

                                                                     

                                           

                                                   

Add a comment
Know the answer?
Add Answer to:
Question 6 3 pts A hypothesis test is used to prevent a machine from under or...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Question 6 3 pts A hypothesis test is used to prevent a machine from under or overfilling bottles of soda. On the basis...

    Question 6 3 pts A hypothesis test is used to prevent a machine from under or overfilling bottles of soda. On the basis of a sample, the hypothesis is rejected and the machine is shut down for inspection. An examination reveals there is nothing wrong with the filling machine. From a statistical point of view: O A Type 1 Error was made O A correct decision was made O A Type II Error was made O A Type I and...

  • A hypothesis test is used to prevent a machine from overfilling or under filling bottles of...

    A hypothesis test is used to prevent a machine from overfilling or under filling bottles of soda. On the basis of a sample, the hypothesis is rejected and the machine is shut down for inspection. A thorough examination reveals there is nothing wrong with the filling machine. From a statistical point of view: A Type II error was made A correct decision was made A Type I and Type II error was made A Type I error was made

  • A production line operation is tested for filling weight accuracy using the following hypotheses. Hypothesis Ho:...

    A production line operation is tested for filling weight accuracy using the following hypotheses. Hypothesis Ho: 1 = 16 Hai + 16 conclusion and Action Filling okay, keep running Filling off standard; stop and adjust machine The sample size is 32 and the population standard deviation is o = 0.9. Use a = .05. Do not round intermediate calculations. a. What would a Type II error mean in this situation? Concluding that the mean filling weight is 16 ounces when...

  • CENGAGE MINDTAP Search this course napter 9 Assignment ох eBook Consider the following hypothesis test: HO:...

    CENGAGE MINDTAP Search this course napter 9 Assignment ох eBook Consider the following hypothesis test: HO: 50 OH > 50 A sample of 50 is used and the population standard deviation is 8. Use the critical value approach to state your conclusion for each of the following sample results. Use a = .05. a. With I-52.5, what is the value of the test statistic (to 2 decimals)? Can it be concluded that the population mean is greater than 50? b....

  • Question 6 (1 point) A test is made of Ho: mean = 27 versus Hi: mean...

    Question 6 (1 point) A test is made of Ho: mean = 27 versus Hi: mean < 27. The true value of the mean is 27, and Ho is rejected. Is this a Type I error, Type II error, or a correct decision? Type I error Type II error Correct decision O Question 7 (1 point) A test is made of Ho: mean = 71 versus Hii mean < 71. The true value of the mean is 35, and Ho...

  • A can of soda is labeled as containing 10 Ruld ounces. The quality control manager wants...

    A can of soda is labeled as containing 10 Ruld ounces. The quality control manager wants to verify that the fining machine is neither over ng or underling the car. Complete parts a town in below (a) Determine the land alternative hypotheses at would be used to determine if the filling machine is colorated correctly HY (Type integers or decimals. Do not round) (b) The quality control manager obtains a sample of 83 cars and measures the contents. The sample...

  • 2side Hypothesis Testing_03 (two independent sam machines are used for filling plastic battle with a new volume of...

    2side Hypothesis Testing_03 (two independent sam machines are used for filling plastic battle with a new volume of 16.0 ounces. The fill volume can be assumed was with standard deviations d. 0.020 and 0.025 ounces. A member of the quality engineering staff that both machines fill to the same mean net volume, whether or not this volume is 16.0 ounces. random sample of 10 bottles is taken from the output of each machine: Machine 01 16.03 16.01 16.04 15.96 16.05...

  • Please help with this question 2. A sports analogy for hypothesis tests Aa Aa E In...

    Please help with this question 2. A sports analogy for hypothesis tests Aa Aa E In recent years, professional sports have incorporated the use of instant replay in order to dispute questionable calls by the referees. For example, in the National Basketball Association (NBA) a head coach is allowed to challenge the referees' decision on whether a shot was made before time expired in the game. In order for the referees to reverse their original decision, the instant replay must...

  • Question 25 3 pts Suppose that the null hypothesis is that the medical treatment is not...

    Question 25 3 pts Suppose that the null hypothesis is that the medical treatment is not effective. Suppose that the medical treatment is truly effective, but a researcher does not reject the null hypothesis at the 5-percent level of significance. This researcher o is guilty of a post hoc ergo propter hoc fallacy. o has conducted a test with high statistical power. o has made a Type 1 error. o has made a Type 2 error. Question 26 3 pts...

  • A steel factory produces iron rods that are supposed to be 36 inches long. The machine...

    A steel factory produces iron rods that are supposed to be 36 inches long. The machine that makes these rods does not produce each rod exactly 36 inches long. The lengths of these rods vary slightly. It is known that when the machine is working properly, the mean length of the rods is 36 inches. According to design, the standard deviation of the lengths of all rods produced on this machine is always equal to .05 inches. The quality control...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT