Question

Vasquez Systems produces high-quality table tops. Each table top is produced from a single large tree...

Vasquez Systems produces high-quality table tops. Each table top is produced from a single large tree in a 3-step process consisting of milling, sanding, and cutting. All raw material is introduced at the start of the milling process. The company uses a process costing system for all costs incurred throughout the production cycle. The following data were extracted from each department's cost of production report prepared for April:

Milling Dept. The beginning balance of work in process was $280,000. During April, additional costs of $695,000 were incurred. The additional costs were attributable to direct materials (80%), direct labor (10%), and factory overhead (10%). The ending balance of work in process was $165,000.

Sanding Dept. The beginning balance of work in process was $180,000. During April, additional costs of

$410,000 were incurred. The additional costs were attributable to direct labor (80%) and factory overhead (20%). The ending balance of work in process was $295,000.

Cutting Dept. The beginning balance of work in process was $370,000. During April, additional costs of

$160,000 were incurred. The additional costs were attributable to direct labor (70%) and factory overhead (30%). The ending balance of work in process was $220,000.

Calculate the transfer of costs between departments and into finished goods.

A.

From Milling to Sanding

865,000

From Sanding to Cutting

1,147,000

From Cutting to Finished Goods

1,448,000

B.

From Milling to Sanding

804,000

From Sanding to Cutting

1,085,000

From Cutting to Finished Goods

1,165,000

C.

From Milling to Sanding

865,000

From Sanding to Cutting

1,156,000

From Cutting to Finished Goods

1,408,000

D.

From Milling to Sanding

810,000

From Sanding to Cutting

1,105,000

From Cutting to Finished Goods

1,415,000

E.

From Milling to Sanding

804,000

From Sanding to Cutting

1,101,000

From Cutting to Finished Goods

1,476,000

F.

None of the above

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Option D is correct i.e:

From Milling to Sanding

810,000

From Sanding to Cutting

1,105,000

From Cutting to Finished Goods

1,415,000

Explanations:-

From Milling to Sanding :-

Beginning WIP

$280000

Add: Additional Cost incurred

$695000

Less: Ending WIP

$165000

$810000

From Sanding to Cutting :-

Cost transferred from Milling Dept

$810000

Add: Beginning WIP

$180000

Add: Additional Cost incurred

$410000

Less: Ending WIP

$295000

$1105000

From Cutting to Finished Goods:-

Cost transferred from Sanding Dept

$1105000

Add: Beginning WIP

$370000

Add: Additional Cost incurred

$160000

Less: Ending WIP

$220000

$1415000

Add a comment
Know the answer?
Add Answer to:
Vasquez Systems produces high-quality table tops. Each table top is produced from a single large tree...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Sierra Company manufactures soccer balls in two sequential processes: Cutting and Stitching. All direct materials enter...

    Sierra Company manufactures soccer balls in two sequential processes: Cutting and Stitching. All direct materials enter production at the beginning of the Cutting process. The following information is available regarding its May inventories: Work in process inventory-Cutting Work in process inventory-Stitching Finished goods inventory Beginning Ending Inventory Inventory 73,500 75,500 93,300 69,800 26,100 14,250 The following additional information describes the company's production activities for May. Direct materials Raw materials purchased on credit $ 40,000 Direct materials used-Cutting 22,500 Direct materials...

  • Please show the computation to obtain the answers. 12. Required information [The following information applies to...

    Please show the computation to obtain the answers. 12. Required information [The following information applies to the questions displayed below.) Part 1 of 2 0.58 points Sierra Company manufactures soccer balls in two sequential processes: Cutting and Stitching. All direct materials enter production at the beginning of the Cutting process. The following information is available regarding its May inventories: Beginning Ending Inventory Inventory $ 76,000 $ 91,750 183,500 130,500 Raw materials inventory Work in process inventory- Cutting Work in process...

  • At the end of the year, overhead applied was $3,706,000. Actual overhead was $3,418,000. Closing over/underapplied...

    At the end of the year, overhead applied was $3,706,000. Actual overhead was $3,418,000. Closing over/underapplied overhead into Cost of Goods Sold would cause net income to a.decrease by $576,000 b.decrease by $288,000 c.increase by $288,000 d.increase by $576,000 A manufacturing company applies factory overhead based on direct labor hours. At the beginning of the year, it estimated that factory overhead costs would be $345,800 and direct labor hours would be 42,600. Actual manufacturing overhead costs incurred were $320,800, and...

  • Required information [The following information applies to the questions displayed below.] Sierra Company manufactures soccer balls...

    Required information [The following information applies to the questions displayed below.] Sierra Company manufactures soccer balls in two sequential processes: Cutting and Stitching. All direct materials enter production at the beginning of the Cutting process. The following information is available regarding its May inventories: Work in process inventory-Cutting Work in process inventory-stitching Finished goods inventory Beginning Inventory 43,500 63,300 20,100 Ending Inventory 51,500 60,500 8,250 The following additional information describes the company's production activities for May. Direct materials Raw materials...

  • Sierra Company manufactures soccer balls in two sequential processes: Cutting and Stitching. All direct materials enter...

    Sierra Company manufactures soccer balls in two sequential processes: Cutting and Stitching. All direct materials enter production at the beginning of the Cutting process. The following information is available regarding its May inventories: Work in process inventory-Cutting Work in process inventory-Stitching Finished goods inventory Beginning Ending Inventory Inventory 223,500 150,500 243, 300 116,300 56,100 44,250 The following additional information describes the company's production activities for May. Direct materials Raw materials purchased on credit Direct materials used-Cutting Direct materials used-Stitching $115,000...

  • Sierra Company manufactures soccer balls in two sequential processes: Cutting and Stitching. All direct materials enter...

    Sierra Company manufactures soccer balls in two sequential processes: Cutting and Stitching. All direct materials enter production at the beginning of the Cutting process. The following information is available regarding its May inventories: Raw materials inventory Work in process inventory-Cutting Work in process inventory-stitching Finished goods inventory Beginning Inventory $ 51, 000 133, 500 153, 300 38,100 Ending Inventory $ 61,000 105,500 88, 400 26,250 The following additional information describes the company's production activities for May. Direct materials Raw materials...

  • i need some corrections please Problem 03-1A Production cost flow and measurement, journal entries LO P1,...

    i need some corrections please Problem 03-1A Production cost flow and measurement, journal entries LO P1, P2, P3, P4 The following information applies to the questions displayed below) Sierra Company manufactures soccer balls in two sequential processes: Cutting and Stitching. All direct materials enter production at the beginning of the Cutting process. The following information is available regarding its May inventories: Work in process inventory-Cutting Work in process inventory-Stitching Finished goods Inventory Beginning Inventory 153,500 173,300 42,100 Ending Inventory 115,500...

  • Sierra Company manufactures soccer balls in two sequential processes: Cutting and Stitching. All direct materials enter...

    Sierra Company manufactures soccer balls in two sequential processes: Cutting and Stitching. All direct materials enter production at the beginning of the Cutting process. The following information is available regarding its May inventories: Beginning Inventory Ending Inventory Work in process inventory—Cutting 43,500 51,500 Work in process inventory—Stitching 63,300 60,500 Finished goods inventory 20,100 8,250 The following additional information describes the company's production activities for May. Direct materials Raw materials purchased on credit $ 25,000 Direct materials used—Cutting 21,750 Direct materials...

  • Required information [The following information applies to the questions displayed below.] Sierra Company manufactures soccer balls...

    Required information [The following information applies to the questions displayed below.] Sierra Company manufactures soccer balls in two sequential processes: Cutting and Stitching. All direct materials enter production at the beginning of the Cutting process. The following information is available regarding its May inventories: Work in process inventory-Cutting Work in process inventory-Stitching Finished goods inventory Beginning Ending Inventory Inventory 43,500 51,500 63,300 60,500 20,100 8,250 The following additional information describes the company's production activities for May. Direct materials Raw materials...

  • Lubricants, Inc. produces a speclal kind of grease that is widely used by race car drivers. The grease Is produced In t...

    Lubricants, Inc. produces a speclal kind of grease that is widely used by race car drivers. The grease Is produced In two processing departments-Refining and Blending. Raw materials are Introduced at various points In the Refining Department The following Incomplete Work In Process account is availla ble for the Refining Department for March: Work in Process-Refining Department March 1 balance 32,600 Completed and transferred to Blending Materials 139.608 Direct labor 63.200 489.000 Overhead March 31 balance The March 1 work...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT