Answer | |
1 |
Predetermined overhead rate: |
Expected actual activity | |
$15600/ (120 x 30) = $4.33 | |
Theoretical activity | |
$15600/ (150 x 30) = $3.47 | |
2 | Expected actual activity. |
Since Expected actual activity, is more reliable. | |
Please like | |
Activity Levels Used to Compute Overhead Rates Reggie Wilmore has just started a new business-building and...
Exercise 2-1 (Algo) Compute a Predetermined Overhead Rate [LO2-1) Harris Fabrics computes its plantwide predetermined overhead rate annually on the basis of direct labor-hours. At the beginning of the year, it estimated that 33,000 direct labor-hours would be required for the period's estimated level of production. The company also estimated $592,000 of fixed manufacturing overhead cost for the coming period and variable manufacturing overhead of 54.00 per direct labor-hour. Harris's actual manufacturing overhead cost for the year was 5786,895 and...
Fickel Company has two manufacturing departments-Assembly and Testing & Packaging. The predetermined overhead rates in Assembly and Testing & Packaging are $16.00 per direct labor-hour and $12.00 per direct labor-hour, respectively. The company's direct labor wage rate is $20.00 per hour. The following information pertains to Job N.60 Testing Packaging Assembly $ 340 Direet materials Direct labor Required: 1. What is the total manufacturing cost assigned to Job N-60? 2. If Job N-60 consists of 10 units, what is the...
Exercise 2-1 Compute a Predetermined Overhead Rate (LO2-1] 0.62 points Harris Fabrics computes its plantwide predetermined overhead rate annually on the basis of direct labor-hours. At the beginning of the year, it estimated that 20,000 direct labor-hours would be required for the period's estimated level of production. The company also estimated $94,000 of fixed manufacturing overhead cost for the coming period and variable manufacturing overhead of $2.00 per direct labor-hour. Harris's actual manufacturing overhead cost for the year was $123,900...
Just need the Manufacturing Overhead, Is this correct way to set
it up?
Morton Company's budgeted variable manufacturing overhead is $2.50 per direct labor-hour and its budgeted fixed manufacturing overhead is $360,000 per year. The company manufactures a single product whose standard direct labor-hours per unit is 3.5 hours. The standard direct labor wage rate is $10 per hour. The standards also allow 2 feet of raw material per unit at a standard cost of $6 per foot. Although normal...
Exercise 2-1 Compute a Predetermined Overhead Rate [LO2-1] Harris Fabrics computes its plantwide predetermined overhead rate annually on the basis of direct labor-hours. At the beginning of the year, it estimated that 20,000 direct labor-hours would be required for the period's estimated level of production. The company also estimated $94,000 of fixed manufacturing overhead cost for the coming period and variable manufacturing overhead of $2.00 per direct labor-hour. Harris's actual manufacturing overhead cost for the year was $123.900 and its...
eBook Calculator Applied Overhead and Unit Overhead Cost: Plantwide Rates Seco, Inc., produces two types of clothes dryers: deluxe and regular. Seco uses a plantwide rate based on direct labor hours to assign its overhead costs. The company has the following estimated and actual data for the coming year Estimated overhead $2,000,000 Expected activity 50,000 Actual activity (direct labor hours): Deluxe dryer 10,000 Regular dryer 40,000 Units produced Deluxe dryer 20,000 Regular dryer 200,000 Required: 1. Calculate the predetermined plantwide...
Applied Overhead and Unit Overhead Cost: Plantwide Rates Seco, Inc., produces two types of clothes dryers: deluxe and regular. Seco uses a plantwide rate based on direct labor hours to assign its overhead costs. The company has the following estimated and actual data for the coming year: Estimated overhead $1,664,000 Expected activity 52,000 Actual activity (direct labor hours): Deluxe dryer 12,000 Regular dryer 40,000 Units produced: Deluxe dryer 24,000 Regular dryer 200,000 Required: 1. Calculate the predetermined plantwide overhead rate,...
Applied Overhead and Unit Overhead Cost: Plantwide Rates Seco, Inc., produces two types of clothes dryers: deluxe and regular. Seco uses a plantwide rate based on direct labor hours to assign its overhead costs. The company has the following estimated and actual data for the coming year: Estimated overhead $1,944,000 Expected activity 54,000 Actual activity (direct labor hours): Deluxe dryer 15,000 Regular dryer 39,000 Units produced: Deluxe dryer 30,000 Regular dryer 195,000 Required: 1. Calculate the predetermined plantwide overhead rate,...
Applied Overhead and Unit Overhead Cost: Plantwide Rates Seco, Inc., produces two types of clothes dryers: deluxe and regular. Seco uses a plantwide rate based on direct labor hours to assign its overhead costs. The company has the following estimated and actual data for the coming year: Estimated overhead $2,040,000 Expected activity 51,000 Actual activity (direct labor hours): Deluxe dryer 10,000 Regular dryer 41,000 Units produced: Deluxe dryer 20,000 Regular dryer 205,000 Required: 1. Calculate the predetermined plantwide overhead rate,...
Applied Overhead and Unit Overhead Cost: Plantwide Rates Seco, Inc., produces two types of clothes dryers: deluxe and regular. Seco uses a plantwide rate based on direct labor hours to assign its overhead costs. The company has the following estimated and actual data for the coming year: Estimated overhead $1,976,000 Expected activity 52,000 Actual activity (direct labor hours): Deluxe dryer 8,000 Regular dryer 44,000 Units produced: Deluxe dryer 16,000 220,000 Regular dryer Required: 1. Calculate the predetermined plantwide overhead rate,...