(a)

Three Hands Co. manufactures metal candleholders. Using a traditional manufacturing technique, Three Hands can produce a batch of five hundred White Gothic candleholders using 500 kg of alloy metal, 100 hours of labour time, and 3 hours of set-up time. After a re-engineering study Three Hands can now produce the same size batch of candleholders with only 300 kg of alloy metal, 60 hours of labour time, and 2 hours of set-up time. The labour cost for Three Hands is $$15 per hour, and the cost of the alloy metal is $$10 per kg. Machine set-ups cost $$20 per hour.

(b)

Twister Co. Ltd produces electric fans. The company used to employ two quality inspectors (with annual salary of $$35,000) to ensure that the final product meets customer specifications. In addition, each month 50 hours of direct labour hours were spent reworking defective products. After a careful study of the manufacturing process and the acquisition of an improved assembling machine, quality inspection is no longer necessary and products requiring rework has been reduced by half.

(c)

Argus Pet Food has recently conducted a process analysis, which resulted in the adoption of the same kind of packaging technique for the company's large variety of pet foods. Subsequent cost-savings will come from the scrapping of two packaging machines (each costs $$5,000 per month to run).

Required:

There are four ways of reducing activity costs (i.e., activity elimination, reduction, selection, or sharing). For each situation, please (i) identify the activity that is being improved, and (ii) classify the proposed improvement under one of the four ways of reducing activity costs.

(i) (ii)
(a)

Set-up

Design

Scrapping
Hire

Re-engineering

Process analysis

Packaging

Rework

Manufacturing

Quality inspection

Activity reduction

Activity elimination

Activity selection

Activity sharing

(b)

Set-up

Design

Scrapping
Hire

Re-engineering

Process analysis

Packaging

Rework

Manufacturing

Quality inspection

Activity reduction

Activity elimination

Activity selection

Activity sharing

(c)

Set-up

Design

Scrapping
Hire

Re-engineering

Process analysis

Packaging

Rework

Manufacturing

Quality inspection

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Answer :

Sr. No. Process Ways of reducing cost
a Re-engineering Activity reduction
b Quality Inspection Activity Elimination
c Packaging Activity Sharing

Activity reduction is the process of decreasing the time and resources required by an activity. For serial number "a" through re-engineering less time and resource would be required

Activity elimination is the process where particular activity is eliminated which was not adding value. For serial number "b" the existing quality inspection process is eliminated through improved assembled machine

Activity sharing is the process where increasing the efficiency of necessary activities using economies of scale. For serial number "c" the existing packaging machine will be used.

Add a comment
Know the answer?
Add Answer to:
Consider the following situations: (a) Three Hands Co. manufactures metal candleholders. Using a traditional manufacturing technique,...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Value Added and Non-Value Added Costs, Unused Capacity For Situations 1 through 6, provide the following...

    Value Added and Non-Value Added Costs, Unused Capacity For Situations 1 through 6, provide the following information: a. An estimate of the non-value-added cost caused by each activity. If required, round your final answer to the nearest dollar. b. The root causes of the activity cost (such as plant layout, process design, and product design). C. The appropriate cost reduction measure: activity elimination, activity reduction, activity sharing, or activity selection, 1. It takes 48 minutes and five pounds of material...

  • Value Added and Non-Value Added Costs, Unused Capacity For Situations 1 through 6, provide the following...

    Value Added and Non-Value Added Costs, Unused Capacity For Situations 1 through 6, provide the following information: a. An estimate of the non-value-added cost caused by each activity. If required, round your final answer to the nearest dollar. b. The root causes of the activity cost (such as plant layout, process design, and product design). c. The appropriate cost reduction measure: activity elimination, activity reduction, activity sharing, or activity selection. Choose "Multiple" in the Root cause column, wherever there is...

  • [The following information applies to the questions displayed below. Kitchen King's Toledo plant manufactures three product...

    [The following information applies to the questions displayed below. Kitchen King's Toledo plant manufactures three product lines, all multi-burner, ceramic cook tops. The plant's three product models are the Regular (REG), the Advanced (ADV). and the Gourmet (GMT). Until recently, the plant used a job- order product-costing system, with manufacturing overhead applied on the basis of direct-labor hours. The following table displays the basic data upon which the traditional costing system was based. $171 (9 hrs. $19 per hr.) $2e9...

  • LO 2 8-47 Target costing Mercedes-Benz All Activity Vehicle (AAV)'3 Introduction During the recession beginning in...

    LO 2 8-47 Target costing Mercedes-Benz All Activity Vehicle (AAV)'3 Introduction During the recession beginning in the early 1990s, Mercedes-Benz (MB) struggled with product development, cost efficiency, material purchasing, and problems in adapting to changing mar- kets. In 1993, these problems caused the worst sales slump in decades, and the luxury car maker lost money for the first time in its history. Since then, MB has streamlined the core business, re- duced parts and system complexity, and established simultaneous engineering...

  • please read instructions on the first picture and follow it Discussion Board: Chapter 1 Due: Jun...

    please read instructions on the first picture and follow it Discussion Board: Chapter 1 Due: Jun 28, 2019 at 11:59 PM Please read the article titled Evolution of Operations Planning and Control: from production to supply chains In at least three paragraphs, describe how and why the focus of operations planning and control has changed over time. While one might argue that answers consisting of sentences quoted from articles do not represent plagiarism, I do not consider them acceptable, and...

  • please read instructions on the first picture and follow it Discussion Board: Chapter 1 Due: Jun...

    please read instructions on the first picture and follow it Discussion Board: Chapter 1 Due: Jun 28, 2019 at 11:59 PM Please read the article titled Evolution of Operations Planning and Control: from production to supply chains In at least three paragraphs, describe how and why the focus of operations planning and control has changed over time. While one might argue that answers consisting of sentences quoted from articles do not represent plagiarism, I do not consider them acceptable, and...

  • How can we assess whether a project is a success or a failure? This case presents...

    How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...

  • I have this case study to solve. i want to ask which type of case study...

    I have this case study to solve. i want to ask which type of case study in this like problem, evaluation or decision? if its decision then what are the criterias and all? Stardust Petroleum Sendirian Berhad: how to inculcate the pro-active safety culture? Farzana Quoquab, Nomahaza Mahadi, Taram Satiraksa Wan Abdullah and Jihad Mohammad Coming together is a beginning; keeping together is progress; working together is success. - Henry Ford The beginning Stardust was established in 2013 as a...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
Active Questions
ADVERTISEMENT