Question

I started with 2-methylcyclohexanol and reacted with h3PO4 to get alkene isomers. based on these GC results, what is the percent of each isomer produced?Qualitative Analysis Report User Chromatograms Fragmentor Voltage Collision Energy 0 Ionization Mode EI x107+El BPC Scan Dehy

0 0
Add a comment Improve this question Transcribed image text
Answer #1

The reaction was:

он

As you can see, there are only two possible products, so two peaks should appear in the chromatogram. Since there are more than 2 peaks, we can assume that there is some sort of secondary product or contamination. We will consider these to be the least abundant, so we will work with the two biggest peaks in terms if area, which are peak 1 and peak 4. Amongst these, the addition of their relativa abundances is 125.11 (100 + 25.11). So we can calculate the fraction of each as:

25.11 0.20 1: 125.11

20% of the least abundant isomer (which is the one most to the right, since it is the least substituted alkene.

100 2: 125.11 0.80

80% of the most abundant isomer, which is 1-methylcyclohexene, the most substituted isomer, as predicted by Saytzeff's rule.

Add a comment
Know the answer?
Add Answer to:
I started with 2-methylcyclohexanol and reacted with h3PO4 to get alkene isomers. based on these GC...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • ample Data Item 1 2 3 4 5 Group 1 Group 2 Group 3 13 19...

    ample Data Item 1 2 3 4 5 Group 1 Group 2 Group 3 13 19 16 13 18 14 13 19 16 13 19 15 12 18 15 Print Done p=0.95 D 2 4 5 6 7 8 9 10 D 2 4 5 6 7 8 9 10 11 12 1797 6.08 4.50 3.93 3.64 3.46 3.34 3.26 3.20 3.15 3.11 3.08 3.06 3.03 3.01 3.00 2.98 2.97 2.96 2.95 2.92 2.89 2.86 2.83 2.80 2.77 13 14...

  • Part 2 Based upon the results to part 1, the project requires hauling materials to, or...

    Part 2 Based upon the results to part 1, the project requires hauling materials to, or from, the site. The following equipment is available for earthwork operations: - One 5-cy heaped capacity bucket loader; a 0.5 min cycle time; 90% fill capacity. - One 7-cy heaped capacity bucket loader; a 0.6 min cycle time; 90% fill capacity. 45.9-cy heaped capacity off-road trucks; a 0.5 min dump time; 100% fill capacity. - Loaded trucks travel through the following three sections: Haul...

  • Problem #1: TO SELECT THE MOST ECONOMICAL Wio SHAPE COLUMN ZO FEET IN HEIGHT SUPPORT AH...

    Problem #1: TO SELECT THE MOST ECONOMICAL Wio SHAPE COLUMN ZO FEET IN HEIGHT SUPPORT AH AXIAL LORD OF 370 KIPS using soksi STEEL! ASSUME A FIXED BASE ANDA PINGED TOP (CASE C) WIDE FLANGE SHAPES HP Axis Y-Y Theoretical Dimensions and Properties for Designing Flange Axis X-X | Weight Area Depth Web Section per of of Thick- Thick- Number Foot Section Section Width S 'T Sy Ty ness ness < * A by tw in. in. in.' in. in....

  • 1. Two manufacturing processes are being compared to try to reduce the number of defective products...

    1. Two manufacturing processes are being compared to try to reduce the number of defective products made. During 8 shifts for each process, the following results were observed: Line A Line B n 181 | 187 Based on a 5% significance level, did line B have a larger average than line A? *Use the tables I gave you in the handouts for the critical values *Use the appropriate test statistic value, NOT the p-value method *Use and show the 5...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT