SunQuest Labs Marc Gillinov, president of SunQuest Labs, was reviewing summary cost reports early in January 2018 when the da

The amount of direct labor required to perform a CMP is twice as much as that required for a CBC test. The supervisor allowed

A check of actual lab records showed the following: CBC tests CMP tests 2016 28,000 40,000 2017* 40,000 40,000 *These quantit

0 0
Add a comment Improve this question Transcribed image text
Answer #1
Answer 1
Note 1 Increase in Testing Material Cost is due to the fact that more CMP tests were conducted during 2017
and a CMP test requires twice the testing kit , as required in CBC test. Moreover, The cost of testing
kit has also gone up from $ 0.20 to $ 0.25 ( increase of 33% )
Note 2 Direct Labour - Direct Labour has incrased from $ 0.18 per test to $ 0.24 per test ( by increase of 25% )
Note 3 Indirect labour - Two workers eliminated as the new system purchased , resulted into decrease
in Indirect labour cost . However, the increase in Depreciation is the corresponding impact
Note 4 Utilities and Other variable overheads are corresponding to the increase in the volume from  
2016 to 2017 and are normal
Note 5 Depreciation is doubled due to impact of new machine depreciation , having a useful life of 10 years
Note 6 Lab rent is having a fixed rent increase if around 10 % , which is normal
Others -almost doubled, need to investigate in detail the breakup of others
Note 7 General burden is an allocated cost and it is based on indirect labour rate ,which has decreased and
despite overall decrease in Indirect labour cost and General overhead, the General burden cost
has increased , which needs to be investigated.
Answer 2
Lab manager has not performed well , which is clear in following words
1) The Lab Manager has shown poor control over the consumption of Test Kit , which has consumed
around 34% higher than standards in year 2016 , while 13% higher in 2017
2) Increase in Utilities and Others - is also to be questioned, it has been more than corresponding increase in work
3) General burden expenses have increased , while it should have come down as the corresponding expenditure
on General overhead and other indirect expenses has decreased, which shows poor control
4) It seems that night shift working has been done and during night shift there was mismanagement in
consumption of testing kit , wastage of utilities and others.

Workings

Blood testing facility
2016 2017 variance
$ $
Testing Materials 29000 34000 5000 Note 1
Direct Labor 455000 609000 154000 Note 2
Lab overhead 0
Variable 0
Indirect Labor 39500 10500 -29000 Note 3
Utilities 32720 36295 3575 Note 4
Other 12520 16695 4175 Note 4
Fixed 0
Supervision 40000 40000 0
Depreciation 25000 50000 25000 Note 5
Lab rent 72000 78000 6000 Note 6
Other 8460 14900 6440 Note 6
General burden 73700 84500 10800 Note 7
Total 787900 973890 185990
Overall Cost working
2016 2017 2016 2017 Increase / decrease
Qty Qty Amount Amount
CBC tests 28000 40000 0
CMP tests 40000 40000 0
Testing kits consumed CBC Tests 28000 40000 0
CMP Tests 80000 80000 0
should be consumed 108000 120000 0 0 0
Actual consumed 145000 136000 0
Cost / kit 0.2 0.25 0
Testing material cost 29000 34000 5000
Cost per test 0.18 0.24 0
Cost of testing 26100 32640 6540
Direct labour 4 CBC / hour 0
2 CBC / hour 0
hourly rate / hour 16 20 448000 608000 160000
Night shift 17.6 22 0
Hours paid 28000 30400 0
General Overhead 888600 836500 -52100
Indirect labour cost 950000 500000 -450000
Fixed overhead 135000 180000 45000
Variable factory overhead 2.50/ hr 2/hr 70000 60800 -9200
Depreciation 0
Total 2546700 2251940 -294760
Add a comment
Know the answer?
Add Answer to:
SunQuest Labs Marc Gillinov, president of SunQuest Labs, was reviewing summary cost reports early in January...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Chem Labs Inc. has entered into a contract with the provincial government to conduct some tests....

    Chem Labs Inc. has entered into a contract with the provincial government to conduct some tests. The company analyzes the chemical and bacterial composition of well water in various municipalities. The contract price is $25.20 per test performed. The normal volume is 10,000 tests per month. Each test requires two testing kits, which are $3.80 each at standard price. Direct labour to perform the test at standard is 10 minutes at $28.80 per hour. At normal volume, the overhead costs...

  • Chem Labs Inc. has entered into a contract with the provincial government to conduct some tests....

    Chem Labs Inc. has entered into a contract with the provincial government to conduct some tests. The company analyzes the chemical and bacterial composition of well water in various municipalities. The contract price is $25.20 per test performed. The normal volume is 10,000 tests per month. Each test requires two testing kits, which are $3.80 each at standard price. Direct labour to perform the test at standard is 10 minutes at $28.80 per hour. At normal volume, the overhead costs...

  • Bio Labs Inc. has entered into a contract with the provincial government to conduct some tests....

    Bio Labs Inc. has entered into a contract with the provincial government to conduct some tests. The company analyzes the chemical and bacterial composition of well water in various municipalities. The contract price is $25.20 per test performed. The normal volume is 10,000 tests per month Each test requires two testing kits, which are $3.80 each at standard price. Direct labour to perform the test at standard is 10 minutes at $28.80 per hour. At normal volume, the overhead costs...

  • Marc Goudreau, administrator of Clearwater Hospital, was puzzled by the prior month’s reports. “Every month, it’s anyone...

    Marc Goudreau, administrator of Clearwater Hospital, was puzzled by the prior month’s reports. “Every month, it’s anyone’s guess whether the lab will show a profit or a loss. Perhaps the only answer is to increase our lab fees again.” “We can’t,” replied Rhoda Groves, the controller. “There are still a lot of complaints about the last increase, particularly from the insurance companies and government health units. They’re now paying only about 82% of what we bill. I’m beginning to think...

  • I ONLY need help with instruction D.... (d)  Provide possible explanations for each unfavorable variance. Bonita Labs...

    I ONLY need help with instruction D.... (d)  Provide possible explanations for each unfavorable variance. Bonita Labs performs steroid testing services to high schools, colleges, and universities. Because the company deals solely with educational institutions, the price of each test is strictly regulated. Therefore, the costs incurred must be carefully monitored and controlled. Shown below are the standard costs for a typical test. Direct materials (1 petri dish @ $1.80 per dish)           $  1.80 Direct labor (0.5 hours @ $20.50 per hour)                   10.25 Variable...

  • Problem 23-5A (Part Level Submission) Hart Labs, Inc. provides mad cow disease testing for both state...

    Problem 23-5A (Part Level Submission) Hart Labs, Inc. provides mad cow disease testing for both state and federal governmental agricultural agencies. Because the company's customers are governmental agencies, prices are strictly regulated. Therefore, Hart Labs must constantly monitor and control its testing costs. Shown below are the standard costs for a typical test. Direct materials (2 test tubes @ $1.70 per tube) Direct labor (1 hour @ $30 per hour) Variable overhead (1 hour @ $7.00 per hour) Fixed overhead...

  • Problem 23-5A (Part Level Submission) Hart Labs, Inc. provides mad cow disease testing for both state...

    Problem 23-5A (Part Level Submission) Hart Labs, Inc. provides mad cow disease testing for both state and federal governmental agricultural agencies. Because the company's customers are governmental agencies, prices are strictly regulated. Therefore, Hart Labs must constantly monitor and control its testing costs. Shown below are the standard costs for a typical test. Direct materials (2 test tubes @ $1.00 per tube) Direct labor (1 hour @ $32 per hour) Variable overhead (1 hour @ $6.00 per hour) Fixed overhead...

  • CALCULATOR PRINTER VERSION RACK Problem 23-5A (Part Level Submission) Hart Labs, Inc. provides mad cow disease...

    CALCULATOR PRINTER VERSION RACK Problem 23-5A (Part Level Submission) Hart Labs, Inc. provides mad cow disease testing for both state and federal governmental agricultural agencies. Because the company's customers are governmental agencies, prices are strictly regulated. Therefore, Hart Labs must constantly monitor and control its testing costs. Shown below are the standard costs for a typical test. Direct materials (2 test tubes $1.70 per tube) Direct labor (1 hour $32 per hour) Variable overhead (1 hour $7.00 per hour) Fixed...

  • CALCULATOR PRINTER VERSION BLACK roblem 23-5A (Part Level Submission) art Labs, Inc. provides mad cow disease...

    CALCULATOR PRINTER VERSION BLACK roblem 23-5A (Part Level Submission) art Labs, Inc. provides mad cow disease testing for both state and federal governmental agricultural agencies. Because the company's customers are governmental gencies, prices are strictly regulated. Therefore, Hart Labs must constantly monitor and control its testing costs. Shown below are the standard costs for a typical test. Direct materials (2 test tubes $1.70 per tube) Direct labor (1 hour $32 per hour) Variable overhead (1 hour $7.00 per hour) Fixed...

  • 5-17 ABC, cost hierarchy, service. (CMA, adapted) Vineyard Test Laboratories does heat testing (HT) and stress...

    5-17 ABC, cost hierarchy, service. (CMA, adapted) Vineyard Test Laboratories does heat testing (HT) and stress testing (ST) on materials and operates at capacity. Under its current simple costing system, Vineyard aggregates all operating costs of $1,190,000 into a single overhead cost pool. Vineyard calculates a rate per test-hour of $17 ($1,190,000 = 70,000 total test-hours). HT uses 40,000 test-hours, and ST uses 30,000 test-hours. Gary Celeste, Vineyard's controller, believes that there is enough variation in test procedures and cost...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT