1) Overhead rate = 198970/19700 = 10.10 per labor hour
Journal entry
Transaction | General Journal | Debit | Credit |
a | Work in process (1970*10.10) | 19897 | |
Manufacturing overhead | 19897 | ||
(to record applied overhead) | |||
b | Manufacturing overhead | 22770 | |
Account payable/cash | 22770 | ||
(To record actual overhead) | |||
c | Cost of goods sold (22770-19897) | 2873 | |
Manufacturing overhead | 2873 | ||
(To record manufacturing overhead) | |||
3a) Increase
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on...
4 Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $186,120. Estimated direct labor cost was $469,260 for 19,800 hours. oints Actual costs for the most recent month are summarized here: Total Cost $ 46,927 Iten Description Direct labor (1,980 hours) Indirect costs Indirect labor Indirect materials eBook 2,540 3,45e 3,210 4,770 5,740 1,220...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $190,000. Estimated direct labor cost was $448,400 for 19,000 hours. Actual costs for the most recent month are summarized here: Total Cost $ 44,841 Item Description Direct labor (1,900 hours) Indirect costs Indirect labor Indirect materials Factory rent Factory supervision Factory depreciation Factory janitorial work...
E2-19 (Algo) Preparing Journal Entries (LO 2-S1) Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $172,040. Estimated direct labor cost was $458,150 for 18,700 hours. Actual costs for the most recent month are summarized here: Total Cost $45,816 Item Description Direct labor (1,870 hours) Indirect costs Indirect labor Indirect materials Factory rent Factory...
E2-19 (Algo) Preparing Journal Entries [LO 2-S1) Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $175,680. Estimated direct labor cost was $452,010 for 18,300 hours. Actual costs for the most recent month are summarized here: Total Cost $45,202 Item Description Direct labor (1,830 hours) Indirect costs Indirect labor Indirect materials Factory rent Factory...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $186,120. Estimated direct labor cost was $469,260 for 19,800 hours. Actual costs for the most recent month are summarized here: Total Cost $ 46,927 Item Description Direct labor (1,900 hours) Indirect costs Indirect labor Indirect materials Factory rent Factory supervision Factory depreciation Factory Janitorial work...
Verizox Company uses a job order cost system with manufacturing
overhead applied to products based on direct labor hours. At the
beginning of the most recent year, the company estimated its
manufacturing overhead cost at $172,040. Estimated direct labor
cost was $437,580 for 18,700 hours. Actual costs for the most
recent month are summarized here: Item Description Total Cost
Direct labor (1,870 hours) $ 43,759 Indirect costs Indirect labor
2,530 Indirect materials 3,340 Factory rent 3,360 Factory
supervision 4,710 Factory...
Vertzox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $194000 Estimated direct labor cost was $459 70 for 19.400 hours Actual costs for the most recent month are summarted here Total & waren 2. Item Description Direct Labor (1.9 hours) Tere Indirect labor Indirect materials Factory rent Factory supervision Factory depreciation Factory S torial...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $191,040. Estimated direct labor cost was $493,520 for 19,900 hours. Actual costs for the most recent month are summarized here: Total Item Description Direct labor (1,990 hours) Cost $49,353 Indirect costs Indirect labor 2,470 3,450 3,220 4,850 5,790 1,220 1,890 4,270 5,320 Indirect materials Factory...
Tyler Tooling Company uses a job order cost system with overhead applied to products on the basis of machine hours. For the upcoming year, the company estimated its total manufacturing overhead cost at $239,020 and total machine hours at 62,900. During the first month of operations, the company worked on three jobs and recorded the following actual direct materials cost, direct labor cost, and machine hours for each job: Job 101 Job 102 Job 103 Total Direct materials used $...
Tyler Tooling Company uses a job order cost system with overhead
applied to products on the basis of machine hours. For the upcoming
year, the company estimated its total manufacturing overhead cost
at $252,400 and total machine hours at 63,100. During the first
month of operations, the company worked on three jobs and recorded
the following actual direct materials cost, direct labor cost, and
machine hours for each job: Job 101 Job 102 Job 103 Total Direct
materials used $...