Answer : With explanation
Basis :
Relevant cost is the cost which is relevant for decision making and it is usually the cost which is different for given alternatives. The cost which is same in all alternatives is not relevant for decision making or in other words is irrelevant.
Explanation | |||||
a. | Supplies costs | Not relevant | As cost incurred on supplies is same under both the alternatives so it is not relevant for making the decision as which alternative is to be chosen | ||
Power costs | Relevant | As cost incurred on Power costs is same under both the alternatives so it is not relevant for making the decision as which alternative is to be chosen | |||
Inspection cost | Relevant | As cost incurred on Inspection cost is same under both the alternatives so it is not relevant for making the decision as which alternative is to be chosen | |||
Assembly Costs | Not relevant | As cost incurred on Assembly Costs is same under both the alternatives so it is not relevant for making the decision as which alternative is to be chosen | |||
b. | Differential Cost | $ 9,700 | Difference between the total relevant cost of both the alternatives calculated as below | ||
Calculation of Differential Costs | |||||
Cost of | Alternative Q | Alternative R | Differential cost = Q-R | ||
Power costs | $ 30,500 | $ 29,600 | $ 900 | ||
Inspection cost | $ 19,000 | $ 29,600 | $ (10,600) | ||
Total Relevant cost | $ 49,500 | $ 59,200 | $ (9,700) |
Thanks a lot
Kindly hit thumbs up if satisfied
For any query mention in comment section please
please explain the right answer to me. thanks so much Costs associated with two alternatives, code-named...
Costs associated with two alternatives, code-named Q and R, being considered by Albiston Corporation are listed below: Supplies costs Power costs Inspection costs Assembly costs Alternative e $85,000 $38,000 $35,000 $46,000 Alternative R $85,000 $37,200 $37,200 $46,000 Required: a. Which costs are relevant and which are not relevant in the choice between these two alternatives? b. What is the differential cost between the two alternatives? a. Supplies costs Power costs Inspection costs Assembly costs b. Differential cost
Costs associated with two alternatives, code-named Q and R, being considered by Albiston Corporation are listed below: Supplies costs Power costs Inspection costs Assembly costs Alternative $68,000 $31,500 $22,000 $36,000 Alternative R $68,000 $30,300 $30,300 $36,000 Required: a. Which costs are relevant and which are not relevant in the choice between these two alternatives? b. What is the differential cost between the two alternatives? a. Supplies costs Power costs Inspection costs Assembly costs b. Differential cost
Nicklin Corporation is considering two alternatives that are, code-named M and N. Costs associated with the alternatives are listed below Supplies costs Assembly costs Power costs Inspection costs ative $72.000 $45,000 $25.000 $38,000 $84.000 $45,000 $38.000 $27,000 Required: a. Which costs are relevant and which are not relevant in the choice between these two alternatives? Supplies costs Assembly costs Power costs Inspection costs b. What is the differential cost between the two alternatives? ifferental oost
4. Rockett Corporation is considering two alternatives that are code-named M and N. Costs associated with the alternatives are listed below: Alternative M Alternative N Supplies costs 31,000.00 52,000.00 Assembly costs 33,000.00 33,000.00 Power costs 23,000.00 27,000.00 Inspection costs 15,000.00 21,000,00 Required: a. Which costs are relevant and which are not relevant in the choice between these two alternatives? WHY? b. What is the differential cost between the two alternatives?
Cardon, Inc. is considering two options, X and Y. Costs associated with each option are listed below: Option X Option Y Supplies costs $ 74,000 $ 74,000 Power costs $ 34,200 $ 33,400 Inspection costs $ 27,000 $ 33,400 Assembly costs $ 39,000 $ 39,000 a. Which costs are relevant and which are not relevant in the choice between these two options? b. What is the differential cost between the two options? a.Supplies costs Power costs Inspection costs Assembly costs...
Arabian Power Company has two ME alternatives available for producing power using Gas Turbines and providing energy at a remote wory with the cash low estimates associated with each alternative e given below. Use the conventional B/C ratio method to determine which alternative should be lected as an were ve of 10% per year over a 25-you study period One alternative must be selected Alternative X Alternative Y Fast costs, AED 1,000,000 900.000 Annual M&O costs, AED per year 380,000...
i want a hand written solution if possible. thanks! Two mutually exclusive alternatives are being considered for the environmental protection equipment at a petroleum refinery. One of these alternatives must be selected. a. Which environmental protection equipment alternative should be selected? The firm's MARR is 20% per year. Assume the equipment will be needed indefinitely. Assume repeatability is appropriate for this comparison. b. Assume the study period is shortened to five years. The market value of Alternative B after five...
Please answer the questions. Thanks! 3. MoCo has two major business segments-Brojan and Projan. In December, the Brojan business segment had sales revenues of $50,000, variable expenses of $20,000, and traceable fixed expenses of $5,000. During the same month, the Projan business segment had sales revenues of $50,000, variable expenses of $25,000, and traceable fixed expenses of $10,000. Common fixed expenses totaled $19,000 and were allocated as follows: $11,000 to the Brojan segment and $7,000 to the Projan segment. The...
Question 13 15 points Save Answer The two ME alternatives shown are under consideration for facility improvements in a company in Abu Dhabi. Determine which one should be selected based on a B/C analysis. Assume an interest rate of 10% per year and a 5-year study period. Alternative X Alternative Y First costs, AED 40,000 90,000 20,000 Annual M&O costs, AED per year 50,000 150,000 Benefits, AED per year 120,000 Disbenefits, AED per year 30,000 10,000 Match the closest correct...
Question 13 15 points Save Answer The two ME alternatives shown are under consideration for facility improvements in a company in Abu Dhabi. Determine which one should be selected based on a B/C analysis. Assume an interest rate of 10% per year and a 5 year study period Alternative X Alternative Y 90,000 First costs, AED 40.000 50,000 20,000 Annual M&O costs, AED per year Benefits, AED per year 120,000 150,000 Disbenefits, AED per year 30,000 10,000 Match the closest...