1. Compute the predetermined overhead rate for the year.
2. Compute the amount of underapplied or overapplied overhead for the year.
3. Prepare a schedule of cost of goods manufactured for the year. Assume all raw materials are used in production as direct materials.
4. Compute the unadjusted cost of goods sold for the year. Do not include any underapplied or overapplied overhead in your answer.
5. Assume that the $38,000 ending balance in Work in Process includes $8,100 of direct materials. Given this assumption, supply the information missing below:
Required 1 : | |
Predetermined overhead rate = Estimated manufacturing overhead / Estimated direct materials costs = 133500 / 89000 | 150% |
Required 2 : | |
Beginning raw materials | 28000 |
(+) Purchase of raw materials | 132000 |
Total raw materials available | 160000 |
(-) Ending raw materials | 10000 |
Raw materials used | 150000 |
Overhead applied = Raw materials used * Predetermined overhead rate = 150000 * 150% | 225000 |
Indirect labor | 142500 |
Property taxes | 8700 |
Depreciation of equipment | 18000 |
Maintenance | 16000 |
Insurance | 7300 |
Rent, building | 37000 |
Actual overhead costs | 229500 |
As the overhead applied are less than the actual overhead costs, the overheads are underapplied | |
Underapplied overhead = Actual overhead costs - Overhead applied = 229500 - 225000 | 4500 |
Underapplied | Overhead | 4500 |
Required 3 : | ||
Gitano Products | ||
Schedule of cost of goods manufactured | ||
Direct materials : | ||
Beginning raw materials | 28000 | |
Purchase of raw materials | 132000 | |
Total raw materials available | 160000 | |
Ending raw materials | 10000 | |
Raw materials used in production | 150000 | |
Direct labor cost | 85000 | |
Manufacturing overhead applied | 225000 | |
Total manufacturing costs | 460000 | |
Beginning work in process | 46000 | |
Total cost of work in process | 506000 | |
Ending work in process | 38000 | |
Cost of goods manufactured | 468000 |
Required 4 : | |
Cost of goods manufactured | 468000 |
(+) Beginning finished goods | 70000 |
(-) Ending finished goods | 60000 |
Unadjusted cost of goods sold | 478000 |
Required 5 : | |
Direct materials | 8100 |
Direct labor cost ( 38000 - 8100 - 12150 ) | 17750 |
Manufacturing overhead ( 8100 * 150% ) | 12150 |
Work in process inventory | 38000 |
1. Compute the predetermined overhead rate for the year. 2. Compute the amount of underapplied or...
1. Compute the predetermined overhead rate for the year. 2. Compute the amount of underapplied or overapplied overhead for the year. 3. Prepare a schedule of cost of goods manufactured for the year. Assume all raw materials are used in production as direct materials. 4. Compute the unadjusted cost of goods sold for the year. Do not include any underapplied or overapplied overhead in your answer. 5. Assume that the $39,000 ending balance in Work in Process includes $8,400 of...
1. Predetermined overhead rate: 130% 2. Underapplied overhead 3,800 3. Prepare a schedule of cost of goods manufactured for the year. Assume all raw materials used in production as direct materials. 4. Compute the unadjusted cost of goods sold for the year. Do not include any underapplied or overapplied overhead in your answer. Gitano Products operates a job-order costing system and applies overhead cost to jobs on the basis of direct materials used in production(not on the basis of raw...
Gitano Products operates a job-order costing system and applies overhead cost to jobs on the basis of direct materials used in production (not on the basis of raw materials purchased). Its predetermined overhead rate was based on a cost formula that estimated $111.800 of manufacturing overhead for an estimated allocation base of $86,000 direct material dollars to be used in production. The company has provided the following data for the just completed year. $ 134,000 $ 82,000 Purchase of raw...
Gitano Products operates a job-order costing system and applies overhead cost to jobs on the basis of direct materials used in production (not on the basis of raw materials purchased). Its predetermined overhead rate was based on a cost formula that estimated $139,500 of manufacturing overhead for an estimated allocation base of $93,000 direct material dollars to be used in production. The company has provided the following data for the just completed year: $ 132,000 Ş 89,000 Purchase of raw...
Problem 3-14 Schedule of Cost of Goods Manufactured; Overhead Analysis (LO3-3, LO3-4) Gitano Products operates a job-order costing system and applies overhead cost to jobs on the basis of direct materials used in production (not on the basis of raw materials purchased). Its predetermined overhead rate was based on a cost formula that estimated $118,300 of manufacturing overhead for an estimated allocation base of $91,000 direct material dollars to be used in production. The company has provided the following data...
Please show work, thank you! 1. Compute the predetermined overhead rate for the year. 2.Compute the amount of underapplied or overapllied overhead for the year. Gitano Products operates a job-order costing system and applies overhead cost to jobs on the basis of direct materials used in production(not on the basis of raw materials purchased). Its predetermined overhead rate was based on a cost formula that estimated $113,100 of manufacturing overhead for an estimated allocation base of $87000 direct material dollars...
Gitano Products operates a job-order costing system and applies overhead cost to jobs on the basis of direct materials used in production (not on the basis of raw materials purchased). Its predetermined overhead rate was based on a cost formula that estimated $111,800 of manufacturing overhead for an estimated allocation base of $86,000 direct material dollars to be used in production. The company has provided the following data for the just completed year: Purchase of raw materials $ 136,000 Direct...
Gitano Products operates a job-order costing system and applies overhead cost to jobs on the basis of direct materials used in production (not on the basis of raw materials purchased). Its predetermined overhead rate was based on a cost formula that estimated $127,500 of manufacturing overhead for an estimated allocation base of $85,000 direct material dollars to be used in production. The company has provided the following data for the just completed year: Purchase of raw materials $ 136,000 Direct...
Gitano Products operates a job-order costing system and applies overhead cost to jobs on the basis of direct materials used in production (not on the basis of raw materials purchased). Its predetermined overhead rate was based on a cost formula that estimated $117,000 of manufacturing overhead for an estimated allocation base of $90,000 direct material dollars to be used in production. The company has provided the following data for the just completed year: $ 139,000 $ 86,000 Purchase of raw...
Gitano Products operates a job-order costing system and applies overhead cost to jobs on the basis of direct materials used in production (not on the basis of raw materials purchased). Its predetermined overhead rate was based on a cost formula that estimated $128,800 of manufacturing overhead for an estimated allocation base of $92,000 direct material dollars to be used in production. The company has provided the following data for the just completed year: Purchase of raw materials $ 133,000 Direct...