EUAC of Land = 150000 * (A/P,11%,4) + 97000 - 29000 * (A/F,11%,4)
= 150000 *0.322326 + 97000 - 29000 *0.212326
= 139191.49
EUAC of incineration = 720000 * (A/P,11%,6) + 62000 - 370000 * (A/F,11%,6)
= 720000 *0.236377 + 62000 - 370000 *0.126377
= 185431.80
EUAC of contract = 144000
As EUAC of Land is lowest it should be eelected