Goedl Company uses a single plant-wide overhead rate. They reported the following beginning of the year estimates: 20,000 labLuster, LLC uses a single, plant-wide overhead rate. The company has two departments, fabrication and painting. Relevant dataJob Y3K incurred the following: $19,500 direct material, $12,400 direct labor, 800 machine hours and 550 labor hours. The comJob Blue2B incurred the following: $15,000 direct material, $12.600 direct labor, 800 machine hours and 550 labor hours. TheJob Blue2B incurred the following: $15,000 direct material, $12.600 direct labor, 800 machine hours, and 550 labor hours. The

0 0
Add a comment Improve this question Transcribed image text
Answer #1
1) Predetermined overhead rate = (fixed overhead / labor hours) + Variable overhead per hour
=($50000/20000) +$2
=$2.5+2
=$4.5
Correct Option: Second
2) Total overhead
Fixed overhead
Fabrication $         12,000
Painting $         28,000
Variable overhead
Fabrication ($18*900 labor hours) $         16,200
Painting ($9*300 MHs) $           2,700
Total $         58,900
Total Machine Hours =1000+300 = 1300
Plant wide overhead rate = $58900/1300
=$45.31 per hour
Total Cost Of Job A2B3
Direct Materias $         280.00
Direct Labors $         330.00
Overhead (9 Mhs*45.31) $         407.79
Total Cost Of Job A2B3 $     1,017.79
Correct Option: SECOND
3) Cost per Unit Of Job Y3K
Direct Materias $   19,500.00
Direct Labors $   12,400.00
Overhead (10*550) $     5,500.00
Total Cost Of Job A2B3 $   37,400.00
Cost Per Unit $           37.40
(37400/1000 units)
Correct Option: FIRST
4) Total COst Of Job Blue 2B
Direct Materias $   15,000.00
Direct Labors $   12,600.00
Overhead (800*$6) $     4,800.00
Total Cost Of Job A2B3 $   32,400.00
Correct Option: THIRD
5) Total COst Of Job Blue 2B
Direct Materias $   15,000.00
Direct Labors $   12,600.00
Overhead (800*$6) $     4,800.00
Total Cost Of Job A2B3 $   32,400.00
Correct Option: SECOND
Add a comment
Know the answer?
Add Answer to:
Goedl Company uses a single plant-wide overhead rate. They reported the following beginning of the year...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • m/courses/1262813/quizzes/3056451/take/questions/44191369 ... Q Demand-pull inflati. Dashboard Question 3 2 pts Luster, LLC uses a single, plant-wide...

    m/courses/1262813/quizzes/3056451/take/questions/44191369 ... Q Demand-pull inflati. Dashboard Question 3 2 pts Luster, LLC uses a single, plant-wide overhead rate. The company has two departments, fabrication and painting. Relevant data is below. Fabrication department: $12,000 fixed overhead, variable overhead $18 per labor hour Painting department: $28,000 fixed overhead, variable $9 per machine hour The company estimated the following hours: Fabrication department: 900 labor hours and 1,000 machine hours Painting department: 1.200 labor hours and 300 machine hours The single, plant-wide overhead rate...

  • A Corporation uses a job-order costing system with a single plant-wide predetermined overhead rate based on...

    A Corporation uses a job-order costing system with a single plant-wide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on total fixed manufacturing overhead cost of $249,000, variable manufacturing overhead of $3.80 per machine-hour, and 30,000 machine-hours. The company has provided the following data concerning Job X784 which was recently completed: Job E's manufacturing cost: Total machine-hours 250 Direct materials $ 470 Direct labor cost $ 5,500 If the company marks...

  • Question 4 2 pts Luster, LLC uses departmental overhead rates. The company has two departments, fabrication...

    Question 4 2 pts Luster, LLC uses departmental overhead rates. The company has two departments, fabrication and painting. Relevant data is below. Fabrication department: $12,000 fixed overhead, variable overhead $18 per labor hour Painting department: $28,000 fixed overhead, variable $9 per machine hour The company estimated the following hours: Fabrication department: 900 labor hours and 1,000 machine hours Painting department: 1,200 labor hours and 300 machine hours The overhead rate is applied based on machine hours in the fabrication department...

  • Lake Erie company uses a plant wide overhead rate with machine hours as the allocation ba...

    Lake Erie company uses a plant wide overhead rate with machine hours as the allocation ba Lake Erie Company uses a plantwide overhead rate with machine hours as the allocation base. Next year, 720,000 units are expected to be produced taking 0.75 machine hours each. How much overhead will be assigned to each unit produced given the following estimated amounts? Department 2 $1,556,000 Estimated: Manufacturing overhead costs Direct labor hours Machine hours Department $3,131,500 162, 000 DLH 262,000 MH 262,000...

  • Moody Corporation uses a job-order costing system with a plant wide overhead rate based on machine-hours....

    Moody Corporation uses a job-order costing system with a plant wide overhead rate based on machine-hours. At the beginning of the year, the company made the following estimates: Machine-hours required to support estimated production…………100,000 Fixed manufacturing overhead cost……………………………….$650,000 Variable manufacturing overhead cost per machine-hour…………$3.0 Required: 1. Compute the predetermined overhead rate During the year, Job 400 was started and completed. The following information was available with respect to the job: Direct materials requisitioned…………………..$450 Direct labor cost………………………………...$210 Machine-hours used……………………………….40 2. Compute...

  • Lupo Corporation uses a job order costing system with a single plantwide predetermined overhead rate based...

    Lupo Corporation uses a job order costing system with a single plantwide predetermined overhead rate based on machine hours. The company based its predetermined overhead rate for the current year on the following data: Total machine-hours Total fixed manufacturing overhead cost Variable manufacturing overhead per machine-hour 30,900 $154,500 $ 3.80 Recently, Job T687 was completed with the following characteristics Number of units in the job Total machine-hours Direct materials Direct labor cost 10 30 $ 740 $1,480 The amount of...

  • Landen Corporation uses a job-order costing system. At the beginning of the year, the company made...

    Landen Corporation uses a job-order costing system. At the beginning of the year, the company made the following estimates: Direct labor-hours required to support estimated production Machine-hours required to support estimated production Fixed manufacturing overhead cost Variable manufacturing overhead cost per direct labor-hour Variable manufacturing overhead cost per machine-hour 140,000 70,000 $ 784,000 $ 2.00 $ 4.00 During the year, Job 550 was started and completed. The following information is available with respect to this job: Direct materials Direct labor...

  • Moody Corporation uses a job-order costing system with a plant wide predetermined overhead rate based on...

    Moody Corporation uses a job-order costing system with a plant wide predetermined overhead rate based on machine-hours. At the beginning of the year, the company made the following estimates: Machine-hours required to support estimated production 155,000 Fixed manufacturing overhead cost $ 651,000 Variable manufacturing overhead cost per machine-hour $ 4.90 Required: 1. Compute the plantwide predetermined overhead rate. 2. During the year, Job 400 was started and completed. The following information was available with respect to this job: Direct materials...

  • Lake Erie Company uses a plant wide overhead rate with machine hours as the allocation base....

    Lake Erie Company uses a plant wide overhead rate with machine hours as the allocation base. Next year, 760,000 units are expected to be produced taking 0.80 machine hours each. How much overhead will be assigned to each unit produced given the following estimated amounts? Estimated: Department 1 Department 2 Manufacturing overhead costs $ 3,139,500 $ 1,568,000 Direct labor hours 166,000 DLH 266,000 DLH Machine hours 266,000 MH 191,000 MH

  • Landen Corporation uses a job-order costing system. At the beginning of the year, the company made...

    Landen Corporation uses a job-order costing system. At the beginning of the year, the company made the following estimates: White Company has two departments, Cutting and Finishing. The company uses a job-order costing system and computes a predetermined overhead rate in each department. The Cutting Department bases Its rate on machine-hours, and the Finishing Department bases its rate on direct labor-hours. At the beginning of the year, the company made the following estimates: Direct labor-hours required to support estimated production...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT