The Metropolitan Water Utility is planning to upgrade its SCADA system for controlling well pumps, booster pumps, and disinfection equipment so that everything can be controlled from one site. The first phase will reduce labor and travel costs by an estimated $31,000 per year. The second phase will reduce costs by an estimated $20,000 per year. If phase I will occur in years1 through 3 and phase II in years 4 through 8, what is
a) The present worth of the savings
b) The equivalent annual worth for years 1 through 8 of the savings?
Use an interest rate of 6 %.
Solve using tabulated factors AND spreadsheet on excel
The Metropolitan Water Utility is planning to upgrade its SCADA system for controlling well pumps, booster...
How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...