Question

5. Costs in the short run versus in the long run

Ike’s Bikes is a major manufacturer of bicycles. Currently, the company produces bikes using only one factory. However, it is considering expanding production to two or even three factories. The following table shows the company’s short-run average total cost (SRATC) each month for various levels of production if it uses one, two, or three factories. (Note: Q equals the total quantity of bikes produced by all factories.)

Average Total Cost (Dollars per bike) Q = 300 Q = 400 Number of factories Q = 100 Q = 200 Q = 500 Q = 600 360 200 240 400 720

Suppose Ike’s Bikes is currently producing 100 bikes per month in its only factory. Its short-run average total cost is

per bike.

Suppose Ike’s Bikes is expecting to produce 100 bikes per month for several years. In this case, in the long run, it would choose to produce bikes using   .

On the following graph, plot the three SRATC curves for Ike’s Bikes from the previous table. Specifically, use the green points (triangle symbol) to plot its SRATC curve if it operates one factory (SRATC1SRATC1); use the purple points (diamond symbol) to plot its SRATC curve if it operates two factories (SRATC2SRATC2); and use the orange points (square symbol) to plot its SRATC curve if it operates three factories (SRATC3SRATC3). Finally, plot the long-run average total cost (LRATC) curve for Ike’s Bikes using the blue points (circle symbol).

Note: Plot your points in the order in which you would like them connected. Line segments will connect the points automatically.

HHH SRATC, SRATC2 - AVERAGE TOTAL COST (Dollars per bike) H SRATC LRATC . 0 100 200 500 600 700 300 400 QUANTITY (Bikes)

In the following table, indicate whether the long-run average cost curve exhibits economies of scale, constant returns to sca

1 1
Add a comment Improve this question Transcribed image text
Answer #1

800 220 ISRATLI 640 560 480 „SRATE VDO SRATEZ IRATO 320- 240 160 LRATC 100 200 300 400 soo 600 tooLehen consumer decreases and income drops shifts to the demand left. Suppose .... Suppose hes Bikes is . . . ... S 360 per b

> why would you do this on paper you freak

maryquishe Thu, Nov 18, 2021 5:50 PM

Add a comment
Know the answer?
Add Answer to:
5. Costs in the short run versus in the long run Ike’s Bikes is a major...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 5. Costs in the short run versus in the long run Ike's Bikes is a major...

    5. Costs in the short run versus in the long run Ike's Bikes is a major manufacturer of bicycles. Currently, the company produces bikes using only one factory. However, it is considering expanding production to two or even three factories. The following table shows the company's short-run average total cost (SRATC) each month for various levels of production if it uses one, two, or three factories. (Note: Q equals the total quantity of bikes produced by all factories.) Number of...

  • 5. Costs in the short run versus in the long run Ike's Bikes is a major...

    5. Costs in the short run versus in the long run Ike's Bikes is a major manufacturer of bicycles. Currently, the company produces bikes using only one factory. However, it is considering expanding production to two or even three factories. The following table shows the company's short-run average total cost (SRATC) each month for various levels of production if it uses one, two, or three factories. (Note: Q equals the total quantity of bikes produced by all factories.) Average Total...

  • Costs in the short run versus in the long run Ike’s Bikes is a major manufacturer...

    Costs in the short run versus in the long run Ike’s Bikes is a major manufacturer of bicycles. Currently, the company produces bikes using only one factory. However, it is considering expanding production to two or even three factories. The following table shows the company’s short-run average total cost (SRATC) each month for various levels of production if it uses one, two, or three factories. (Note: Q equals the total quantity of bikes produced by all factories.) Number of Factories...

  • 4. Costs in the short run versus in the long run Ike’s Bikes is a major...

    4. Costs in the short run versus in the long run Ike’s Bikes is a major manufacturer of bicycles. Currently, the company produces bikes using only one factory. However, it is considering expanding production to two or even three factories. The following table shows the company’s short-run average total cost (SRATC) each month for various levels of production if it uses one, two, or three factories. (Note: Q equals the total quantity of bikes produced by all factories.) Number of...

  • 3. Costs in the short run versus in the long run Ike's Bikes is a major...

    3. Costs in the short run versus in the long run Ike's Bikes is a major manufacturer of bicycles. Currently, the company produces bikes using only one factory. However, it is considering expanding production to two or even three factories. The following table shows the company's short-run average total cost (SRATC) each month for various levels of production if it uses one, two, or three factories. (Note: Q equals the total quantity of bikes produced by all factories.) Number of...

  • 5. Costs in the short run versus in the long run Ike's Bikes is a major...

    5. Costs in the short run versus in the long run Ike's Bikes is a major manufacturer of bicycles. Currently, the company produces bikes using only one factory. However, it is considering expanding production to two or even three factories. The following table shows the company's short-run average total cost (SRATC) each month for various levels of production if it uses one, two, or three factories. (Note: Q equals the total quantity of bikes produced by all factories.) Number of...

  • 5. Costs in the short run versus in the long run Ike’s Bikes is a major manufacturer of bicycles....

    5. Costs in the short run versus in the long runIke’s Bikes is a major manufacturer of bicycles. Currently, the company produces bikes using only one factory. However, it is considering expanding production to two or even three factories. The following table shows the company’s short-run average total cost (SRATC) each month for various levels of production if it uses one, two, or three factories. (Note: Q equals the total quantity of bikes produced by all factories.)Number of FactoriesAverage Total...

  • Attempts: Average: /4 5. Costs in the short run versus in the long run Ike's Bikes...

    Attempts: Average: /4 5. Costs in the short run versus in the long run Ike's Bikes is a major manufacturer of blcycles. Currently, the company produces bikes using only one factory. However, it is considering expanding production to two or even three factories. The following table shows the company's short-run average total cost (SRATC) each month for various levels of production if it uses one, two, or three factories. (Note: Q equals the total quantity of bikes produced by all...

  • 11. Costs in the short run versus in the long run Ike's Bikes is a major...

    11. Costs in the short run versus in the long run Ike's Bikes is a major manufacturer of bicydes. Currently, the company produces bikes using only one factory. However, it is considering expanding production to two or even three factories. The following table shows the company's short-run average total cost each month for various levels of production if it uses one, two or three factories. (Note: Q equals the total quantity of bikes produced by all factories.) Average Total Cost...

  • Homework (Ch 13) 5. Costs in the short run versus in the long run Ike's Bikes...

    Homework (Ch 13) 5. Costs in the short run versus in the long run Ike's Bikes is a major manufacturer of bicycles. Currently, the company produces bikes using only one factory. However, it is considering expanding production to two or even three factories. The following table shows the company'shortcun average total cost (SRATC) each month for various levels of production if it was one, two or the factories. (Note: Q the total quantity of bikes produced by all factories.) uals...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT