What is the outcome when designing the optimal Value Stream? a) Current State Value Stream Map b) Future State Value Stream Map c) Optimal State Process Map d) Optimal State Value Map
The correct option is b) Future State Value Stream Map as when designing a optimal value stream, Future State Value Stream Map is created.
Do give a positive rating if you think this answer helped
What is the outcome when designing the optimal Value Stream? a) Current State Value Stream Map...
case: Value Stream Mapping (LO14-3) Value stream mapping involves first developing a baseline map of the current situation of a company's external and/or internal operations, and then applying lean concepts, and developing a future state map that shows improved operations. Exhibit 14.16, for example, shows the current state with a production lead time of 4.5 days. This system is a hatch/push system (indicated by striped arrows) resulting in long delays and inventory buildups. Exhibit 14.17 shows the future state map with...
KRM 6.12 Figure 6.15 provides a new current state value stream map for the family of retainers at the Jensen Bearings, Inc. firm described in Example 6.1. This map depicts the value stream after Kline Steel agrees to accept daily orders for steel sheets and Jensen Bearings continues to deliver the finished goods on a daily basis. Operators work 5 days/week, one shift/day, 8 hours per shift with two 30 minute lunch breaks. Figure 6.15 New Current State Value Stream...
Question Help The table below provides the parameters for a new current state vake stream map for the family traine e Jensen Bearings infirm described in the chapter. This table depicts the value stream atter Kline Steel agrees to condaily orders for steel sheels and also agrees to deliver on a daily basis Calculate each component of the new value stream's reduced lead me Jensen Bearings operates 5 days per week Click the icon to view the data from the...
A particular process is analyzed and an appropriate value stream map (VSM) is created. The total non-value added time is estimated at 10,900 seconds, and the total value-added time is approximately 595 seconds. The rolled throughput yield (RTY) is 93.6%. What is the productive ratio?
What is the future value of an immediate annuity cash flow stream if the current interest rate is 12%? Year Cashflow 1 600 2 800 3 1000 4 1200
t6 Use the value stream map below to answer the following questions:(1S pointy) G Calculate the manufacturing lead time. b. Calculate the total value added time. c. Calculate the Takt time. d. How many parts can be processed in 2 minutes at the "Hone" process? e. Is this an example of a push or pull system? How can you tell? Wich operation is mogt in need of a set up redaction kaizen event and why 130 Se に什00 Parts Monthly...
What are the determinants to develop a good facility layout? Draw and label a basic Value-Stream Map. Explain how it is different from process mapping.
At a rate of 10.5%, what is the future value of the following
cash flow stream?
Select the correct answer.
a. $675.92
b. $693.52
c. $689.12
d. $684.72
e. $680.32
ensider the following timeline detailing a stream of cash flows: Date Cash flow me current market rate of interest is 8%, then the future value (FV) of this stream of cash flows is closest to: A. $14,039 B. $18,718 c. $11,699 D. $5,850
At a rate of 19.5%, what is the future value of the following cash flow stream? Years: 0 1 2 3 4 CFs: $0 $75 $225 $0 $300 a. $644 b. $914 c. $719 d. $794 e. $749