1. Suppose seawater desalination via membrane processing required ~15 kwhe/gallon. Estimate the...
1. Suppose seawater desalination via membrane processing required ~15 kwhe/gallon. Estimate the size of an electric power plant (MWe output) required to desalinate water for a city of 10 million for 1 year. 2. Estimate the global sea level rise associated with a 2°C average surface temperature increase. Assume that the top 500 m of oceans are well mixed (and at uniform temperature).