I just need the answers fo b, c, d A firm uses three machines in the...
A company that manufactures three products, A. & and using three machines, M1, M2, and M3, wants to determine the optimal production schedule the maximizes the total profit. Product A has to be processed by machines M1, M2, and M3, product B requires M1 and M3, while product requires M1 and M2. The unit profits on the three products are $5,54 and 56, respectively. The following linear program is formulated to determine the optimal product mic Maximize S. Z-5x -...
A factory manufactures two products, each requiring the use of three machines. The first machine can be used at most 70 hours; the second machine at most 40 hours; and the third machine at most 90 hours. The first product requires 2 hours on machine 1, 1 hour on machine 2, and 1 hour on machine 3; the second product requires 1 hour on machines 1 and 2 and 3 hours on machine 3. The profit is $40 per unit...
Kalyan Singhal Corp. makes three products, and has three machines available as resources as given in the following LP Maximize contribution contribution 6x, 8x24x X1 7X24X3 72 2x 1x2x 76 X,4X21X3 s 72 X2.X3 20 (C,: hours on machine 1) (C2: hours on machine 2) C3: hours on machine 3) a) Using a computer software for solving LP, the optimal solution achieved is: x, L] (round your response to two decrnal places). 2round your response to two decimal places) X3(round...
A company that manufactures the products, and closing three machines M1, M2, and wants to determine the optimal production schedule that maximizes the total profic Product A has to be processed by machines M1, M2, and Ms product requires M1 and M3, while product requires M1 and M2. The unit profits on the three products are 36, 36, and S7, respectively. The following linear program is formulated to determine the optimal product mix Maxme st ZH66x + 7x x +...
1. Better Products manufactures three products on two machines. There is $30 profit associated with Product 1, $50 profit with Product 2, and $20 profit with Product 3. Each product requires labor time using machine A and machine B. Product 1 requires 1 hour from machine A and 1 hour from machine B. Product 2 requires 4 hours from machine A and 1 hour from machine B. Product 3 requires 1.5 hours from machine A and .5 hours from machine...
Use Excel/Solver add in for accurate answers. Problem 3-19 (Algorithmic) Better Products, Inc., manufactures three products on two machines. In a typical week, 40 hours are available on each machine. The profit contribution and production time in hours per unit are as follows: Category Product 1 Product 2 Product 3 Profit/unit $39 $51 $18 Machine 1 time/unit 1.5 Machine 2 time/unit Two operators are required for machine 1; thus, 2 hours of labor must be scheduled for each hour of...
Clarke Corporation manufactures three products (X-1, X-2, and X-3) utilizing, in one of the processes, a single machine for all products. Data on the individual products follow. X-1 X-2 X-3 Price per unit $ 100 $ 200 $ 400 Variable cost per unit $ 50 $ 120 $ 240 Machine hours per unit 1.0 2.5 4.0 Maximum units demand per period 300,000 150,000 20,000 The single machine used for all three products has a maximum capacity of 500,000 hours per...
4. A company manufactures two products, X and Y by using three machines A, B, and c Each of the products has to be processed on each machines. The Table below shows (a) the hours required on each machine to produce one unit of each of the products (b) the total number of hours available on each machine (c) the profit made on one unit of each product. It is assumed that the profit is directly proportional to the number...
a company which manufactures canoes employs 150 I. A company which manufactures canoes employs 150 employees, each of whom working 35 hours per week. Half of them work in the carpenter department, 50 persons in the plastics department, and the rest of them at the completion department. The company manufactures the simple canoes with net unit profit 8 and the luxury canoes with corresponding profit 10. A simple canoe requires 5 hours in the carpenter department and two hours in...
The Ace Manufacturing Company has orders for three similar products: Product Order (Units) A 1750 B 500 C 1100 Three machines are available for the manufacturing operations. All three machines can produce all the products at the same production rate. However, due to varying defect percentages of each product on each machine, the unit costs of the products vary depending on the machine used. Machine capacities for the next week and the unit costs are as follows: Machine Capacity (Units)...