Q.3 (10 marks) 1. List the main objectives of the post-carburizing heat treatment. (3 marks) to...
3. For a steel alloy it has been determined that a carburizing heat treatment of 10 h duration will raise the carbon concentration to 0.45 wt% at a point 2.5 mm from the surface. Estimate the time necessary to achieve the same concentration at a 5.0 mm position for an identical steel and at the same carburizing temperature. [40]
Please need ASAP Question 3 (10 pts) What are the main objectives of preliminary and primary treatment? List three different systems utlized in primary water and wastewater treatment. Question 3 (10 pts) What are the main objectives of preliminary and primary treatment? List three different systems utlized in primary water and wastewater treatment. We were unable to transcribe this image Question 3 (10 pts) What are the main objectives of preliminary and primary treatment? List three different systems utlized in...
Please need ASAP Question 3 (10 pts) What are the main objectives of preliminary and primary treatment? List three different systems utlized in primary water and wastewater treatment. Question 3 (10 pts) What are the main objectives of preliminary and primary treatment? List three different systems utlized in primary water and wastewater treatment.
Current Attempt In Progress For a steel alloy it has been determined that a carburizing heat treatment of 17 h duration at 700'C will raise the carbon concentration to 0.39 wt at a point 3.9 mm from the surface. Estimate the time necessary to achieve the same concentration at a 7.7 mm position for an identical steel and at a carburizing temperature of 1030°C. Assume that Dois 3.1 * 10 m/s and Q, is 103 kJ/mol. e Textbook and Media...
2 a) It is given that a carburizing heat treatment of 10-hour duration of a steel alloy will raise the carbon content to 0.45 wt% at a point 2.5 mm away from the surface. Compute the time required to get the same concentration at a 5.0-mm position from the surface at the same carburizing temperature for an identical steel alloy (Hint: The diffusion coefficient will be a constant for two identical materials at a given temperature). b) What is the...
6. (10) For a steel alloy at 900'C, it has been determined that a carburizing heat treatment of 8 hours will raise the carbon concentration to 0.35 W% at a point 0 mm from the surface. If the same steel is left in the furnace for 150 hours, to what depth below the surface will there be a carbon concentration of 0.35 wt%? Must show work and support any assumptions. Do = D exf toRT 10 6. (10) For a...
(10 points) Problem S. For a steel alloy it has been determined that a carburizing heat treatment of 10-h ime necessary to achieve the same concentration at a 5.0-mm position for an identical steel and at the duration will raise the carbon concentration to 0.45 wt% at a point 2.5 mm from the surface. Estimate the same carburtzing temperature
Its a thermal treatment of metallic materials from material science questions QUESTION 9 a) Heat treatment schedule for three (3) thin samples of plain carbon steel containing different carbon concentration is summarized in Table Q9(a). Determine and sketch the resultant microstructure for each steel. Distinguish steel 1 from steel 3 with reference to their mechanical properties. Table 29(a) Steel wt% C Heating temperature Soaking time (°C) (minutes) Cooling process 1 0.5 950 60 Furnace cooled 2 0.8 800 60 Air...
Q4- CLO (3) (8 marks) (a) A Carnot refrigerator extracts 35KJ as Q, heat during each cycle, operating each cycle, operating with coefficient of performance of 4.6. What are (a) the energy per cycle tra heat to the kitchen and (b) the work done per cycle? nsferred as
Q 1: Complete Project 1-4. (3 marks) Deliverable: List two security concerns and security options available, and briefly explain. Your explanation of each security concern and security option should not exceed more than three short sentences. Your total answer for this question should not exceed one A4 page.