mechanical design 1 r s e e Thebe For a bolted by with both of each...
For a bolted assembly with eight bolts, the stiffness of cach bolt is k 1.0 MN/mm and the stiffness of the members is k26 MN/mm per bolt. The bolts are preloaded to 75 peroner of proof strength. Assume the external load is equally distrihuted to all the bolts. The bolts am M6 x1 class 5.8 with rolled threads. A fluctuating external load is applied to the cntire with P 60 kN and P - 20 kN. (a) Determine the yielding...