Problem5 While efficiency in the production operation is important to profitability,ACME Valve is also known for high quality fieished products. Parts that do not meet specifications cannot be reworked, so that both the raw material cost and the machine time to produce them are detrimental to profitability. Drills can become holes, and machines can get out of callbration as well For the parts in your department the critical dimension is the diameter of the center hole and design specifications require that tolerances be maintained within 005. To insure that quality is maintained, one part from each machine is sent to the Quality Control Lab each hour and carefully measured and its hole diameter recorded into the QC database for each machine. dull after producing so many parts, typically resulting in oversized To better learn how the QC process is coordinated with the production areas, you are spending a day in the Quality Control Lab. In looking at the data for one of the machines making aluminum flanges, you notice some variation and possibly some trending in the data. The deta points for this machine over the last 24 hours are shown in the control chart below Hole ID (in). Machine #2 2.51 2.505 25 2.495 249 2.485 1 2 3 456789 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 The individual observations are plotted by time (ie. observations 1-24). The upper and lower control limits based on required tolerances for the center hole diameter are shown by the horizontal lines. Looking at this graph, answer the following questions 1) What if anything should be done at observation 6? At what point (which sample should the QC Lab alert manufacturing that the may be out of control or nearly so 2) 3) Did this process actually become out of control and if so how many parts potentially may 4) What could account for the sudden change between samples 23 &24 ess need to be scrapped?
media%2Fde0%2Fde03cb1e-4dc4-44ad-a9a8-c8
media%2Fb20%2Fb20ddb52-a0be-4c56-af6f-e4
0 0
Add a comment Improve this question Transcribed image text
Answer #1

1) at Sample 6, since the cmponent went out of specification, the drill can be checked to see if it has lost its sharpness

2) at Sample 17 the manufacturing team should be alerted as the sample is close to Rework/Rejection and the delta between the hole dia and rejection threshold has been decreasing consistently since sample 8 indicating the manufacturing process has begun to go out of control

3) after sample 18, the process has gone out of control and samples 20,21,22,23 need to be scrapped

4) the drastic change between sample 23 and sample 24 could be the "Change in tool" after the earlier toll has lost its sharpness.

Add a comment
Know the answer?
Add Answer to:
Problem5 While efficiency in the production operation is important to profitability,ACME Valve is also known for...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Hello, If anyone can help me I will grestly appreciate it! I will also give a...

    Hello, If anyone can help me I will grestly appreciate it! I will also give a thumbs up! Autotech Manufacturing is engaged in the production of replacement parts for automobiles. One plant specializes in the production of two parts: Part 127 and Part 234. Part 127 produces the highest volume of activity, and for many years it was the only part produced by the plant. Five years ago, Part 234 was added. Part 234 was more difficult to manufacture and...

  • 109 CASE STUDY Dream Desk Compary Dream Desk Company is a major supplier of office desks for can ...

    109 CASE STUDY Dream Desk Compary Dream Desk Company is a major supplier of office desks for can profit from this market growth if prices can be held in line home and business. The company has been in existence since 1875. Affler serving an apprenticeship as a cabinet maker in the and quick delivery can be promised. Dream Desk operates a 250,000 sq. ft. manufacturing fa- cast, George Dreamer had a violent disagreement with the shop eility in Casa Petite,...

  • Create a cause and effect diagram for the following case: Case Study Eastern Gear,Inc.: Job Shop...

    Create a cause and effect diagram for the following case: Case Study Eastern Gear,Inc.: Job Shop Eastern Gear, Inc., in Philadelphia, Pennsylvania, is a manufacturer of custom-made gears ranging in weight from a few ounces to over 50 pounds. The gears are made of different metals, depending on the customer's requirements. Over the past year, 40 different types of steel and brass alloys have been used as raw materials. See Exhibit 1 for details. be necessary to stop production and...

  • SYNOPSIS The product manager for coffee development at Kraft Canada must decide whether to introduce the...

    SYNOPSIS The product manager for coffee development at Kraft Canada must decide whether to introduce the company's new line of single-serve coffee pods or to await results from the product's launch in the United States. Key strategic decisions include choosing the target market to focus on and determining the value proposition to emphasize. Important questions are also raised in regard to how the new product should be branded, the flavors to offer, whether Kraft should use traditional distribution channels or...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT