Write a project about UML Time Diagram.
It should be between 1000-2000 words as a report format.
Timing diagrams are UML interaction diagrams used to show interactions when a primary purpose of the diagram is to reason about time.
Timing diagrams focus on conditions changing within and among lifelines along a linear time axis. Timing Diagrams describe behavior of both individual classifiers and interactions of classifiers, focusing attention on time of occurrence of events causing changes in the modeled conditions of the Lifelines.
Time Diagram at a Glance
State Timeline Representation
Changes from one state to another are represented by a change in the level of the lifeline. For the period of time when the object is a given state, the timeline runs parallel to that state. A change in state appears as a vertical change from one level to another. The cause of the change, as is the case in a state or sequence diagram, is the receipt of a message, an event that causes a change, a condition within the system, or even just the passage of time.
Value lifeline Representation
The figure below shows an alternative notation of UML Timing diagram. It shows the state of the object between two horizontal lines that cross with each other each time the state changes.
Basic Concepts of Timing Diagrams
Major elements of timing UML diagram - lifeline, timeline, state or condition, message, duration constraint, timing ruler.
Lifeline
A lifeline in a Timing diagram forms a rectangular space within the content area of a frame. Lifeline is a named element which represents an individual participant in the interaction. It is typically aligned horizontally to read from left to right.
Multiple lifelines may be stacked within the same frame to model the interaction between them.
State Timeline in Timing Diagram
A state or condition timeline represents the set of valid states and time. The states are stacked on the left margin of the lifeline from top to bottom.
The cause of the change, as is the case in a state or sequence diagram, is the receipt of a message, an event that causes a change, a condition within the system, or even just the passage of time.
Multiple Compartments
It is possible to stack several life lines of different objects in the same timing diagram. One life line above the other. Messages sent from one object to another can be depicted using simple arrows. The start and the end points of each arrow indicate when each message was sent and when it was received.
State Lifeline
A state lifeline shows the change of state of an item over time. The X-axis displays elapsed time in whatever units are chosen while the Y-axis is labelled with a given list of states. A state lifeline is shown below:
Value Lifeline
A value lifeline shows the change of value of an item over time. The X-axis displays elapsed time in whatever units are chosen, the same as for the state lifeline. The value is shown between the pair of horizontal lines which crosses over at each change in value.
Timeline and Constraints
We can use the length of a timeline to indicate how long the object remains in a particular state by reading it from left to right. To associate time measurements, you show tick marks online the bottom part of the frame.
The example below shows that the Login event is received three time units after the start of the sequence. To show relative times, you can mark a specific instance in time using a variable name. The figure marks the time the sendMail event is received as time
You can use relative time marks in constraints to indicate that a message must be received within a specified amount of time.
State and Value Lifeline Side-by-Side
State and Value Lifelines can be put one after the other in any combination. Messages can be passed from one lifeline to another. Each state or value transition can have a defined event, a time constraint which indicates when an event must occur, and a duration constraint which indicates how long a state or value must be in effect for.
Model Consistency among Interaction Diagrams
Timing diagram should always be consistent with the relevant sequence diagram and state machine. To do this we can attach states in the lifeline for each of the objects in the sequence diagram. We can then derive the corresponding timing diagram much easier by inspecting the message passing between the objects against the states attached in the lifeline. The Carpark example below shows the model consistency between two interaction diagrams.
The figure above shows a sequence diagarm of the car park example, while the figure below presents the corresponding timing diagram of the car park example. The various parts of the timing diagram refer to the content of sequence diagram.
Hope this may help you
Thank you ??
Write a project about UML Time Diagram. It should be between 1000-2000 words as a report...
i need a report of 1000 words, about popeyes chicken sandwich, there is a big story behind that, i need a report based on economics basis, showing the affect of running out of this item on the demand and supply, and the effect on the general market. in managerial economics, we've been asked to write 1000 words about economic news trend, and i found that it is easier to write about popeyes chicken sandwich, they sold out of the item...
UML Class Diagram with Inheritance Objectives Use UML Correctly indicate inheritance Demonstrate permissions Understand inheritance relationships Labwork Please read all of the directions carefully. You will create a UML class diagram reflecting the class hierarchy for a fictional program that manages university personnel as constructed according to the graph displayed below. You will need to think about the attributes and behaviors that are unique to each class, and also those attributes and behaviors that are common amongst the subclasses and...
in 2000 words write about schizophrenia including introduction, prevalence, causes, treatments and reference page using MLA format
Write short report about cache memory organizations .The report should be between (3-6) pages .The report should include: o Introduction about basics of caches o Measuring and improving cache perfomance O IMeasuring and improving cache perfomance o Referencing and citation
8). Write an Essay between 1500 - 2000 words: The role of the project manager with understanding the required organizational governance and stakeholders. Include key skills required by the project manager to perform each and be clear on why each of these activities are important to successful project management. Finally, identify where each of these three process areas; management, organizational, and stakeholder management are used within a project, a graphic for this will be acceptable without any written text if...
write a research paper on demonotization in india about 2000 words with citation
Individual Assignment - microeconomics You will construct a report of 2000 words on any economic issue of your choice. (Eg; Inflation in Zimbabwe, Impact of Covid 19 etc). Your report should include 4 academic sources pertaining to the issue you have selected. Your report should entail the following Cover page • Table of content • Executive summary • Introduction of the issue • Discussion of the issue o Academic source 1 Academic source 2 Academic source 3 o Academic source...
by using your own words and without copy and paste write the report about: what are the advantage of allowing students in University to run their own business by selling the products from time to time?
Write a technical report about the Titanic disaster ( 500 words )
3. (20 points) Write a program that writes to output 1000 random 'words', separated by spaces (word simply means a sequence of alphabetical letters, not necessarily an actual word that can be found in the dictionary). The 'words' you write should be randomly generated sequences of lowercase letters, with random lengths between 3 and 9 characters. Your program must save the word as a string and then print it out using the percent-s format in printf.