Your company has been commissioned to design the water supply pipe network of 25 villa-style home units arranged in five buildings each containing five units on a steeply sloping side. The minimum available pressure at the main tapping is 35 m head, and the furthest fixture outlet is 7.5 m above the main (consider each row of buildings are 1.5 m higher than previous row adjacent to the street). The length of internal piping to the remote outlet in unit 25 is 13 m. THe suggests to include the following items in
Hazen william Nomogram for pipe flow
Pipe | Population served | Max discharge (lit/s) | Assumed diameter | Head loss | Net head m | Velocity | |||||
Previous | Local | Total P | 2.7*200*P/(24*60*60) | mm | Rate per 1000m | Length | Actual loss = rate*length | 35 - ground ht -head loss | m/s | ||
JK | 100 | 25 | 125 | 0.781 | 100 | 50 | 225 | 11.25 | 16.25 | 35-7.5-11.25 | 1.6 |
HI | 75 | 25 | 100 | 0.625 | 80 | 80 | 100 | 8 | 21 | 35-6-8 | 1.9 |
FG | 50 | 25 | 75 | 0.468 | 70 | 125 | 100 | 12.5 | 18 | 35-4.5-12.5 | 2.1 |
DE | 25 | 25 | 50 | 0.3125 | 60 | 175 | 100 | 17.5 | 14.5 | 35-3-17.5 | 2.3 |
BC | 0 | 25 | 25 | 0.156 | 60 | 175 | 100 | 17.5 | 16 | 35-1.5-17.5 | 2.3 |
Use 25 mm dia pipe for internal connections.
Your company has been commissioned to design the water supply pipe network of 25 villa-style home...