2. Determine the outflow hydrograph given the inflow hydrograph below. Use Muskingum routing, the storage time...
Problem 2: The storage-outflow relationship of a reservoir is given below. Determine a) the outflow hydrograph of this reservoir for the given inflow hydrograph. b) the attenuation and translation (106 m3) mos 5 60 10 120 15 180 20 240 25 300 30 360 35 420 40 480 Time imiony 0 7 2 14 4 36 6 45 8 35 10 25 12 19 14 15 16 13 18 11 20 9 22
Time (d) Inflow (cfs) 104 Outflow (cfs) 104 105 116 138 173 232 361 481 738 831 730 612 528 468 441 413 366 334 297 247 210 170 150 129 115 0.333333333 143 182 235 414 486 858 908 700 563 495 440 430 409 345 324 288 226 198 152 144 120 110 101 0.666666667 1.333333333 1.666666667 2.33333333.3 2.666666667 3.3333333313 3.666666667 4 4.333333333 4.666666667 5.333333333 5.666666667 6.333333333 6.666666667 7.333333333 7.666666667 Route the given inflow hydrograph using the Muskingum-Cunge...
A service contract for a video projection system costs $155 a year. You expect to use the system for five years. Instead of buying the service contract, what would be the future value of these annual amounts after five years if you earn 3 percent on your savings? Use Exhibit 1-B. (Round time value factor to 3 decimal places and final answer to 2 decimal places.) Future value Pred 1% T% 10% 11% 1 1000 1.200 100 1.000 1800 1.000...
Can somone show me how to do the 1st problem? Need to
find the LS and SS for the fit and the LH and SH for the hole.
Fits are all SHAFT BASIS METRIC but the shaft and hole diameters can not be used right out of the table. This is because the 3mm shaft tolerance does not match. You will need to lookup the "Fit" from the table, and then use the LS (Largest Shaft) and SS (Smallest Shaft)...
In C++ Programming: Using a single for loop, output the even numbers between 2 and 1004 (inclusive) that iterates (loops) exactly 502 times. The outputted numbers be aligned in a table with 10 numbers per row. Each column in the table should be 5 characters wide. Do not nest a loop inside of another loop. Hint: First create and test the code that output the numbers all on one line (the command line will automatically wrap the output to new...
We understand that your diagram will not be able to portray the bands to their exact base-pair size, and that in some cases you may not be able to calculate an exact size for your bands. Just do your best in terms of positioning the bands in the lanes with respect to the standard markers, but please do not panic if the bands are a couple of mm away from perfect in your diagram. LABEL each band with its size...