Question

A supplier provides parts to a manufacturing company that demands JIT deliveries. At the present time it takes 6 hours to mak
0 0
Add a comment Improve this question Transcribed image text
Answer #1

1. Consumption of the pallets = 2 per hour

Pallets on truck =12

Number of hours taken to consume a truck's material = 12/2 =6 hours.

This is exactly the time which a truck would tak to come back doing a round trip.

In ideal conditions where the consumption rate always remains constant and the trucks never get late, only one truck can do the duty and meet the needs.

2. If there is only one truck and it breaks down, it would lead to delay and the customer's process would be halted till the breakdown is corrected.

3. Supplier can keep one spare vehicle ready ( it need not be purchased but should be available for hire on short notice, for which arrangements can be made with providers), which would take  three -four hours to reach the customer which needs to keep few pallets as buffer, so as to serve the need and  that the delays or small breakdowns don't affect the process. This buffer stock would not incur much cost, and can be determined by assessment of the variaibility of process.

4. If the manufacturer stops for 6 hours, there will be 12 pallets already lying at its premises when the next delivery comes up. If the process continues steadily as usual, the manufacturer would need to have a space to store 12 surplus pallets.

Add a comment
Know the answer?
Add Answer to:
A supplier provides parts to a manufacturing company that demands JIT deliveries. At the present time...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • A supplier provides parts to a manufacturing company that demands JIT deliveries. At the present time it takes 6 hours t...

    A supplier provides parts to a manufacturing company that demands JIT deliveries. At the present time it takes 6 hours to make a round-trip between the supplier's warehouse and the customer, including loading, travel and unloading time. The lot size is 12 pallet loads on a truck, and the manufacturer uses 2 pallets per hour. How many trucks are needed to ship the pallets to the manufacturer? What is likely to happen if the trucks break down? How can the...

  • 109 CASE STUDY Dream Desk Compary Dream Desk Company is a major supplier of office desks for can ...

    109 CASE STUDY Dream Desk Compary Dream Desk Company is a major supplier of office desks for can profit from this market growth if prices can be held in line home and business. The company has been in existence since 1875. Affler serving an apprenticeship as a cabinet maker in the and quick delivery can be promised. Dream Desk operates a 250,000 sq. ft. manufacturing fa- cast, George Dreamer had a violent disagreement with the shop eility in Casa Petite,...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT