. Solve the following problem in order to minimize a. mean flow time b. weighted mean flow time c. mean lateness d. maximum lateness For each of the above solutions, draw the associated Gantt chart indicating the completion time of each job.
0 0
Add a comment Improve this question Transcribed image text
Answer #1

SPT-rule minimize meam blow time Etjco Pim tj 24 F S Ti= man 10,43) dj Wj Ewig = Fs-dj ő ut Of W co 5-oso i oM w {f}= 124 1 S

Add a comment
Know the answer?
Add Answer to:
. Solve the following problem in order to minimize a. mean flow time b. weighted mean...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Assume that the three processes arrived in order: Processes                            CPU Burst Time P1  &n

    Assume that the three processes arrived in order: Processes                            CPU Burst Time P1                                           17 P2                                            6 P3                                            8 a.     Please draw the Gantt chart if FCFS scheduling is used. b.    Please calculate the average waiting time and average completion time under FCFS. You MUST show the calculation procedure. c.      Please draw the Gantt chart if Round Robin is used. d.    Please calculate the average waiting time and completion time under RR with q = 3. You MUST show the calculation...

  • Solve the following Job Sequencing problem. Draw Gantt chart. Find total time elapsed to complete the...

    Solve the following Job Sequencing problem. Draw Gantt chart. Find total time elapsed to complete the jobs and idle time for machines. Job/Machine M1 M2 M3 1 5 9 8 2 3 6 7 3 4 7 6 4 2 8 9 5 6 7 5 6 4 6 9

  • can you provide these following: - Mean flow time? - Maximum lateness? - Number of tardy...

    can you provide these following: - Mean flow time? - Maximum lateness? - Number of tardy jobs? 30. Mike's Auto Body Shop has five cars waiting to be repaired. The shop is quite small, so only one car can be repaired at a time. The number of days required to repair each car and the promised date for each are given in the following table. Repair Time (days) Cars Promised Date 31 22 MN-tun 44 0o = 0 25

  • The software developing firm, Flow Associates, is rolling out the new software. They are calling a...

    The software developing firm, Flow Associates, is rolling out the new software. They are calling a meeting of the potential customers to demonstrate the new software. To setup the meeting requires several tasks to be performed in a designated time period. Based on the management briefing, the system analyst came up with the following paragraph. First reserve the meeting room. Then order the marketing material and brief the managers. After the briefing send put the customer emails and burn sample...

  • Draw flow chart to solve following problem. Wasim sells bunches of flowers at the local shopping...

    Draw flow chart to solve following problem. Wasim sells bunches of flowers at the local shopping center. One day Wasim's boss, Akram, tells Wasim that at any time during the day he (Akram) will need to know: a. how many bunches of flowers have been sold b. what was the value of the most expensive bunch sold c. what was the value of the least expensive bunch sold d. what is the average value of bunches sold.

  • Do the following a) draw the pert nert work resulting from the above information b) draw the Gantt chart from the same information above c) state the paths in the PERT network and determine the cr...

    Do the following a) draw the pert nert work resulting from the above information b) draw the Gantt chart from the same information above c) state the paths in the PERT network and determine the critical path d) what is the minimum number of weeks the project will take to be complete d) what is the maximum cost that the project will take to be completed e) give two advantages and disadvantage of using the Gantt chart as a planning...

  • The following jobs are waiting to be processed at a small machine​ center: JOB DUE DATE...

    The following jobs are waiting to be processed at a small machine​ center: JOB DUE DATE DURATION (DAYS) 10 260 8 20 252 18 30 260 26 40 270 32 50 275 14 All dates are specified as manufacturing planning calendar days. Assume that all jobs arrived on day 200 ​(yesterday) in the order shown but are not scheduled to begin until day 201 (today). a. Sequence the jobs according to LPT? b. What is the average completion (flow) time?...

  • C language show all work 1. [50 pts] Given the following set of processes, with arrival...

    C language show all work 1. [50 pts] Given the following set of processes, with arrival times, priorities, and the length of the CPU burst in ms: Priority Arrival Time Burst time Process P1 P2 P3 P4 4. 3 2 0 0 10 (Note: lower number means higher priority, processes P1, P2, P3, and P4 arrive at the same time, in the given order). a. Draw a Gantt chart showing a FCFS scheduling algorithm. b. Draw a Gantt chart showing...

  • Consider the following set of processes A, B, C, D with the following CPU burst time...

    Consider the following set of processes A, B, C, D with the following CPU burst time and I/O. Find the average waiting time with RR of quantum 10ms and context switch time=2ms. Draw the Gantt chart clearly and give necessary explanations. Process Arrival Time CPU Burst Time VO CPU Burst Time A 0 24 30 15 B 15 23 25 21 C 0 32 D 25 12

  • a) Solve the following problem using graphical method (using the following graph): Minimize f(x,y) - 2x-y...

    a) Solve the following problem using graphical method (using the following graph): Minimize f(x,y) - 2x-y subject to the constraints x2+y's 20 y<x (1) (2) (In the space provided below the graph, please write down your solution clearly) we wish to solve the above problem using Exterior Penalty Function approach. Define b) Suppose augmented cost function and explain how to use it to find a solution to the above problem. a) Solve the following problem using graphical method (using the...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT