PLEASE ANSWER ALL PROBLEMS CORRECTLY.
THANK YOU FOR YOUR HELP!
PROBLEM 1
PROBLEM 2
PROBLEM 3
PLEASE ANSWER ALL PROBLEMS CORRECTLY. THANK YOU FOR YOUR HELP! PROBLEM 1 PROBLEM 2 PROBLEM 3...
PLEASE ANSWER ALL PROBLEMS CORRECTLY. THANK YOU FOR YOUR HELP! PROBLEM 1 PROBLEM 2 (10%) Problem 6: n= 4.2 moles of an ideal gas are pumped into a chamber of volume V=0.085 m. Randomized Variables n= 4.2 moles V=0.085 m A 50% Part (a) The initial pressure of the gas is 1 atm. What is the initial temperature in K) of the gas? T= 50% Part (b) The pressure of the gas is increased to 10 atm. Now what is...
PLEASE ANSWER ALL PARTS OF THE PROBLEM CORRECTLY. THANK YOU FOR YOUR HELP! 9:00 PM (10%) Problem 5: A constant-volume thermometer consists of a rigid bulb and a pressure gauge. To obtain accurate results, this thermometer must be calibrated at a known pressure and temperature. Once this is done, the bulb is sealed off from the atmosphere. The volume and number of moles of gas can no longer change and the temperature is calculated from the pressure measurement. 25% Part...
PLEASE ANSWER ALL QUESTIONS CORRECTLY. THANK YOU FOR YOUR HELP. PROBLEM 1 PROBLEM 2 (10%) Problem 9: An airplane passenger has 85 cm of air in his stomach just before the plane takes off from a sea-level airport. What volume, in cubic centimeters, will the air have at cruising altitude at the same temperature (body temperature) if cabin pressure drops to 7.50 x 104 Pa and no air leaves their stomach? V2 = Grade Summary Deductions 096 Potential 100% sino...
please show all steps and do both. if you dont do both problems please do problem 2 is more important . Problem 2. (45 Points) Cooling water available at 680F is flowing through 1 in diameter tube at a rate of 62000 lb/hr to cool 7000 lb/hr of a lube oil from 200 to 1000F. The specific heat of the lube is 0.62 Btu/lbm oF and viscosity is 5 cp, thermal conductivity is 0.067 Btu/ft-hr °F. The overall heat transfer...
PLEASE ANSWER ALL PROBLEMS CORRECTLY. THANK YOU! PROBLEM 1 PROBLEM 2 PROBLEM 3 PROBLEM 4 Write a polar equation of a conic with the focus at the origin and the given data. parabola, directrix x = 7 Write a polar equation of a conic with the focus at the origin and the given data. hyperbola, eccentricity 5, directrix y = -4 Consider the equation below. 1+ sin(0) (a) Find the eccentricity. e = (b) Identify the conic ellipse parabola hyperbola...
Please provide a step-by-step solution to this problem. Heat Transfer 1. The material should be from the textbook (Fundamentals of Heat and Mass Transfer) or similar 3. The annular pipe arrangement shown in the figure below is made of stainless steel and the outer surface is insulated. Air flows through the central pipe with a mass flow rate, ma0.026 kg/s. Water flows through the annular region with a mass flow rate, mw 0.58 kg/s. At the given position along the...
Please answer questions from Q1 to Q5. Thank you. Solve the following questions; show all your work details. NO credits will be added if short answers are submitted. Q1) Automobiles air bags are inflated by nitrogen gas generated by the rapid decomposition of sodium azide, NaN3: NaN3 (8) ► Na(s) + N2 © (NOT balanced) If an air bag has a volume of 50.0 L and is to be filled with nitrogen gas at 0.828 atm and 26°C, how many...
1) problem solution MUST include a clear, labeled schematic diagram. 2) All assumptions must be clearly stated. 4) Calculations and UNITS must be included 17.28 Radioactive waste is stored in a cylindrical stainless- steel container with inner and outer diameters of 1 m and 1.2 m respectively, so that Ro -0.5 m and Ri -0.6 m. Thermal energy is generated uniformly within the waste material at a volumetric rate of 2 x 105 W/m3. The outer container surface is exposed...
can you please answer question 1 and 3 please ABC General Contractors ABC General Contractors was an established construction company handling small-to medium- sized commercial and industrial construction projects. Some recent projects that the company had completed were a 20,000-square-foot factory building, a four-story office building, and a water filtration plant. TELEVISION TOWER BID The company was now in the process of preparing a bid for a television station for the erection of a 225-foot-high television antenna tower and the...
Please answer (c) and (d). I will rate your response. :) Class Management Help HW 3 - Electric Potential Begin Date: 1/15/2019 9:00:00 AM - Due Date: 2/10/2019 11:59:00 PM End Date: 5/18/2019 7:00:00 PM V l is 35 V. The potential at point 2.V2. is 173 V (6%) Problem 4: Consider two points in an electric field. The potential at point l An electron at rest at point 1 is accelerated by the electric field to point 2 Assignment...