Assignment 2 Question 1 Your company was awarded a culvert contract. The contract manager has appointed...
Assignment 2 Question 1 Your company was awarded a culvert contract. The contract manager has appointed you to manage the project and has requested you to provide a schedule for the client. The contract manager handed you the table below, showing a breakdown of activities involved, together with their duration. The Start date is the 01/02/2021 (1st February 2021) Working week of 5 days, 40 hours must be use. Task Name 1 Setting out Excavation 2 Earthworks/Site Clearing 3 Bulk Excavation 4 Compaction of Culvert bases 5 Setting out Binding 6 Blinding (base 1-8 7 Steel Fixing (base 1-8) 8 Inspection of Steel fixing 9 Formwork base 1-8 2 days Duration Predecessor Resource name 1 day Surveyor 1 day 1 Excavator + General labour 3 days 1+2 Excavator 3 Compactor General Labour 1 day Surveyor 2 days 5 Concrete Foreman + General Labour 3 days 655 Steel Fixer + Reinforcement (4,6t) 1 day 7 General Foreman 2 days 7FF Carpenter General labour Concrete (20m3). Concrete Foreman, 2 days 9 General labour, Poker Unit 1 day 10+7 day Carpenter + General Labour 10 Concrete Casting (base 1-8) 11 Striping Formwork Resource Name Type Std. Rate Work R200.00/hr Work R48.00/hr Material R1 600.00/m R13 000.00 Material Group: Concrete Concrete Foreman Group: General Labour General Labour Group: Material Concrete Reinforcement Group: Overhead Surveyor General Forman Group: Plant Excavator Compactor Poker Unit Group: Shuttering Carpenters Group: Steel Steel Fixer Work Work R200.00/hr R250.00/hr Work Work Work R750.00/hr R62.00 R62.00/hr Work RGS.COM Work R65.00 1. Draw up a Network diagram and Gantt chart and indicate the critical path. a Network Diagram (Arrow chart) 1201 b. Critical Path (10) 6. Start Slag flour) 1101 d. Resource loaded Gantt Chart (Barchart) (20) e Total Resource cost 1201 [80 marks