Product Manufacture Now that the design has been proven to be safe, Mr. Momo starts to...
Product Manufacture Now that the design has been proven to be safe, Mr. Momo starts to think about the manufacturing process of the wing. There are three types of wings to be manufactured for different aircraft types, namely Wing A, Wing Band Wing C. Apart from the aluminum, three other materials to be used are titanium, fibre glass and duralumin. The total amount of titanium, fibre glass and duralumin bought each month by Momo Air are 1.92 kilotonne, 1.02 kilotonne and 1.22 kilotonne, respectively. Mr. Momo's team gives you the following information regarding the manufacture of each wing: One Wing A requires 8 tonne of titanium, 2 tonne of fibre glass and 4 tonne of duralumin One Wing B requires 6 tonne of titanium, 6 tonne of fibre glass and 2 tonne of duralumin One Wing Crequires 4 tonne of titanium, 2 tonne of fibre glass and 6 tonne of duralumin 5. Solve for the number of Wings A, B and C that Momo Air can manufacture each month using a suitable numerical method. If Momo Air decides to change the monthly total amount of materials to 2.6 kilotonne of titanium, 1.8 kilotonne of fibre glass and 2.0 kilotonne of duralumin, determine the number of Wings A, B and C that can be manufactured each month? Hint: use relaxation =1 for Gauss Seidel method