You are a Project Engineer in a well-known engineering
consulting company. One of your
clients, Dato’ Ang Chun Kit is very keen to sponsor a group of UCSI
students to represent
Malaysia in an Innovative Gas Power Cycle Competition, to be held
in Japan. The main
objectives are to build a prototype which operates at promisingly
high and stable
efficiencies, but at the same time can be economically and/or
environmentally attractive.
In your first meeting with Dato’ Ang, you have presented the
conceptual ideas of the
prototype to be operated on cycles below:
▪ Stirling Cycle
▪ Ericsson Cycle
▪ Brayton Cycle
By analysing all three cycles above in terms of working principles,
advantages, and
disadvantages, identify the most suitable cycle for Dato’ Ang’s
sponsorship. With
reasonable arguments, justify why the prototype operated on that
cycle is proposed, and
how the cycle can fulfil all the objectives.
You are a Project Engineer in a well-known engineering consulting company. One of your clients, Dato’...
QUESTION 2 You are a Project Engineer in a well-known engineering consulting company. One of your clients, Dato' Ang Chun Kit is very keen to sponsor a group of UCSI students to represent Malaysia in an Innovative Gas Power Cycle Competition, to be held in Japan. The main objectives are to build a prototype which operates at promisingly high and stable efficiencies, but at the same time can be economically and/or environmentally attractive. In your first meeting with Dato' Ang,...
QUESTION 2 You are a Project Engineer in a well-known engineering consulting company. One of your clients, Dato' Ang Chun Kit is very keen to sponsor a group of UCSI students to represent Malaysia in an Innovative Gas Power Cycle Competition, to be held in Japan. The main objectives are to build a prototype which operates at promisingly high and stable efficiencies, but at the same time can be economically and/or environmentally attractive. In your first meeting with Dato' Ang,...