Question 1 (40 points) A black belt engineer started a new six sigma project to minimize errors and improve processes in an o

0 0
Add a comment Improve this question Transcribed image text
Answer #1

1.

Ans:

Potential Failure Mode Potential Failure Effects SEV Potential Causes OCC Current Control DET RPN Actions Taken SEV OCC DET RPN
Patients wait long time for getting treatment .- Customer satisfaction level getting down
- Clinic impression is going down
- Few patients suffering with pain during long waiting duration
- Doctors are overburdened with work due to which they fails to prodive 100% service to the customers
5 .- Lack of appropriate number of doctors for providing the treatment 7 .- Doctors are pressurised to treat fastly 5 175 .- New doctors appointed after study the arrival rate and service rate of patients 5 3 5 75
Patients leave clinic due to lossing patience
Serious patients not getting immediate treatment just agter reaching at clinic .- Some times patients dies due to delay in processes
- Clinic impression going down
9 .- Poor communication medium
- Improper trainning has given to the staff
2 .- After reach at the clinic the patients' condition ckecked and actions take 2 36 .- In case of arriving serious patients, the ambulance driver or others are trained to inform the patient condition to the clinic just 15-20 mins before reaching at clinic so that the hospital staff will make ready the equipments 9 1 1

9

2.

Answer:

SMED means single minute exchange of dies. It means reduce the setup time dramatically during changing of manufacturing from one product to another product. It has following steps to minimize the setup time:

1. Do the pilot study: It includes equipment selection, team member selection, and set the time for accomplishing the certain activity.

2. List all the activities: Do a video of the entire process and list all individual activities and the duration to accomplish it

3. Categorise the activities: The individual activities need to be categorise into two groups’ i.e external and internal activities.

4. Convert the internal to external activities: It is very much essential to reduce the external time in the production area. Because the value of external time is very high.

5. Systematically arrange the remaining activities.

In this way the setup time / change over time can be reducible up to great extent.

Add a comment
Know the answer?
Add Answer to:
Please answer the two questions with details I will give a rating up Question 1 (40...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT