Group of answer choices
True
False
Ans : True , CLTD , Transform , Hour by Hour are the methods which was developed by ASHRAE (American Society of Heating Refrigeration and Air Conditioning Engineers) which is required to calculate heat gain and loss, the heat load .Therefore the answer is True .
When we develop building loads for built environments we use one of several different methods developed...
summarizr the followung info and write them in your own words and break them into different key points. 6.5 Metering Chamber: 6.5.1 The minimum size of the metering box is governed by the metering area required to obtain a representative test area for the specimen (see 7.2) and for maintenance of reasonable test accuracy. For example, for specimens incorporating air spaces or stud spaces, the metering area shall span an integral number of spaces (see 5.5). The depth of...
summatize the following info and break them into differeng key points. write them in yojr own words apartus 6.1 Introduction—The design of a successful hot box appa- ratus is influenced by many factors. Before beginning the design of an apparatus meeting this standard, the designer shall review the discussion on the limitations and accuracy, Section 13, discussions of the energy flows in a hot box, Annex A2, the metering box wall loss flow, Annex A3, and flanking loss, Annex...
10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...
How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...
Risk management in Information Security today Everyday information security professionals are bombarded with marketing messages around risk and threat management, fostering an environment in which objectives seem clear: manage risk, manage threat, stop attacks, identify attackers. These objectives aren't wrong, but they are fundamentally misleading.In this session we'll examine the state of the information security industry in order to understand how the current climate fails to address the true needs of the business. We'll use those lessons as a foundation...