The flow of water over the broad-crested weir is 15 m3/s. The weir and the channel have a width of 5 m. (Figure 1) Part A Det

Water flows at 450 ft3/s over the 12-ft-wide spillway of the dam. The depth of the water at the bottom apron is 2 ft. (Figure

0 0
Add a comment Improve this question Transcribed image text
Answer #1

2 o y = 1.347m Given 42 = 11:014 m H y im 9= H +| = H=y-1 B =5m Q = 15m315 Cw=0.8 As we know that 3/2 오 Q = 1-4CwB (H + Q? BY) Given Q = 450f315 b = 12ft eft 9, =lft * 9, Y, 1 + its (by vgy, 2 2 2 2 alo 450 2 It 8 12x2 19 81 82 (4+18 [14-95) 11-1+ J1

Add a comment
Know the answer?
Add Answer to:
The flow of water over the broad-crested weir is 15 m3/s. The weir and the channel...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • The flow of water over the broad-crested weir is 18 m/s. The weir and the channel...

    The flow of water over the broad-crested weir is 18 m/s. The weir and the channel have a width of 5 m. (Figure 1) Part A Determine the depth of water y within the channel. Take Cu = 0.80. Express your answer to three significant figures and include the appropriate units. НА ? Value Units Submit Request Answer Figure 1 of 1 > Provide Feedback Next > 1 m

  • Part A Water runs from a sloping channel with a flow of 21 m/s onto a...

    Part A Water runs from a sloping channel with a flow of 21 m/s onto a horizontal channel, forming a hydraulic jump. The channel is 2 m wide, and the water is y1 = 0.75 m deep before the jump. (Figure 1) Determine the depth Y2 of water after the jump. Express your answer to three significant figures and include the appropriate units. μΑ ? Figure y2 = Value 1 of 1 Units Submit Request Answer Part B Y2 What...

  • The sewer pipe, made of unfinished concrete, is required to carry water at 45 ft/s when...

    The sewer pipe, made of unfinished concrete, is required to carry water at 45 ft/s when it is half full. The downward slope of the pipe is 0.0015. (Figure 1) Part A Determine the required internal radius of the pipe. Express your answer using three significant figures. ΟΙ ΑΣφ It vec ? R= ft Submit Request Answer Figure 1 of 1 Provide Feedback R A flow of 7200 ft3/min passes under the sluice gate. At depth yo = 6.5 ft...

  • help please Water flows at 150 ft3 /s down a rectangular channel made of finished concrete....

    help please Water flows at 150 ft3 /s down a rectangular channel made of finished concrete. The channel has a width of 10 ft and a downward slope of 0.0002, and the water depth is 4 ft at the control section A. (Figure 1) Part A Determine the distance z from A to where the depth becomes 3.5 ft. Take n-0.012 Express your answer using three significant figures. vec ft Submit Request Answer Figure < 1of1 Part B Complete previous...

  • Problem 12.85 < 8 of 8 | Review Water is passing over the broad-crested weir in...

     Water is passing over the broad-crested weir in a channel having a width of 3.6 m. (Figure 1) Part A Determine the volumetric flow of water over the weir. Take Cw =0.87.

  • Water flows steadily along a horizontal open channel of uniform width, over a broad-crested weir. The...

    Water flows steadily along a horizontal open channel of uniform width, over a broad-crested weir. The channel bed upstream from the weir (to the left) is d -0.75m above the channel bed downstream from the weir (to the right), as shown in the figure below. The volume flow rate per unit width is Q 6m2 s-1, and the downstream depth of the water is ћ2-d. Take the magnitude of the acceleration due to gravity as g 10ms-2. d - 0.75...

  • Problem 12.83 The rectangular channel has a width of b = 2.5 m and the depth...

    Problem 12.83 The rectangular channel has a width of b = 2.5 m and the depth of flow is 1.5 m. Suppose that H = 0.6 m . Take Cd = 0.83. (Figure 1) Part A Determine the volumetric flow of water over the rectangular sharp-crested weir. Express your answer to three significant figures and include the appropriate units. HA ? Value Units Submit Request Answer Provide Feedback Figure < 1 of 1 1.5 m

  • The sewer pipe, made of unfinished concrete, is required to carry water at 45 ft/s when...

    The sewer pipe, made of unfinished concrete, is required to carry water at 45 ft/s when it is half full. The downward slope of the pipe is 0.0015. (Figure 1) Part A Determine the required internal radius of the pipe. Express your answer using three significant figures. VAE IT vec ? Figure < 1 of 1 R = 2.53 ft Submit Previous Answers Request Answer R X Incorrect; Try Again; 4 attempts remaining Provide Feedback Water flows uniformly down the...

  • A flow of 7200 ft3/min passes under the sluice gate. At depth yo = 6.5 ft...

    A flow of 7200 ft3/min passes under the sluice gate. At depth yo = 6.5 ft the water is essentially at rest. (Figure 1) Y2 = 1.71 ft Submit Previous Answers Correct Figure < 1 of 1 Part B 4 ft Determine the depth yi just before the gate. Express your answer to three significant figures and include the appropriate units. μΑ ? y = 4.93 yo Submit Previous Answers Request Answer X Incorrect; Try Again; 4 attempts remaining Water...

  • A rectangular channel having a width of 8 ft is transporting water at a rate of...

    A rectangular channel having a width of 8 ft is transporting water at a rate of 39(103) ft3/min. Part A If the depth is 8 ft, determine the specific energy at this depth. Express your answer to three significant figures and include the appropriate units. E-1 Value Units Submit Request Answer Part B Determine the specific energy at the critical depth. Express your answer to three significant figures and include the appropriate units. EminValue Units Submit Request Answer

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT