Use Case Name:
Actors:
Triggers:
Preconditions:
Post conditions:
Normal Flow:
11. The ATM verifies that the customer is below withdrawing limits.
Alternate Flows:
2A1: The user has an invalid card. This can be caused because of the condition of the card i.e. card is either broken, bent or magnetic stripe/computer chip is damaged or the encoded data is erased, blocked or not authorized account, inactivated card and/or wrongly inserted card i.e. card is upside down.
5A1: The user entered an invalid PIN.
5.3A1: The user exceeded the number of PIN tries.
8A1: The customer does not have sufficient funds in the bank account.
11A1: The user tries to withdrawal cash above daily withdraw limits.
12A1: The ATM hopper does not have sufficient cash.
12.5A1: The user selects to quit the session.
12A2: The ATM hopper has the wrong denomination of cash.
12.2A1: The user selects to quit the session.
14A1: The card stuck in the ATM.
15A1: The customer fails to take the card.
16A1: The cash stuck in the ATM.
17A1: The customer fails to take their cash.
Kindly revert for any queries
Thanks.
Develop a Use Case diagram, and a Use Case description for using ATM to withdraw cash?...
Q1: What are the differences between a USE CASE diagram and an ACTIVITY diagram? Q2: Develop a Use Case diagram, and a Use Case description for using ATM to withdraw cash. subject: Data management Min: 100 words each
Discuss how Use Case diagrams and Use Case Description are used to create software system? Subject: Data Management Min: 200 words
Discuss how Use Case diagrams and Use Case Description are used to create software system? Subject: Data Management Min: 200 words
Questions Draw sequence diagram based on the use case Draw activity diagram based on the use case Draw state diagram of the ATM machine of the Customer account Summary Description: Allows any bank customer to obtain cash from their bank account. Actor(s): • Bank Customer (primary) • Banking System (secondary) Pre-Condition: • The ATM is operational • The bank customer has a card to insert into the ATM Post-Condition: • The bank customer has received their cash (and optionally a...
Draw a Use Case Diagram along with a Use Case Description describing the use of a new biomedical equipment that can be used for diagnosing type 2 diabetes. I understand how to do the diagram the description is what's confusing me
Complete the following tasks: a. Develop a use case diagram for a convenience food store. Include an actor representing the store manager and use cases for orderItem(), stockItem(), and sellItem(). b. Add more use cases to the diagram you created in Exercise 1a. Include two generalizations for stockItem() called stockPerishable() and stockNonPerishable(). Also include an extension to sellItem() called checkCredit() for cases in which a customer purchases items using a credit card. c. Add a customer actor to the use...
Assg # 2: Develop a Business Use Case and product use Case for the following process A company wants to develop a software to provide its customers following services: Get customers demographic data and places of interest for scheduling vacation Provide a list of interested places to visit based on preference Provide at least 3 packages for any selected vacation spot Packages should include air fare, hotel and car rental Provide customers 3 ways to pay bills; credit card, cash...
5 Consider the activity of making a withdrawal at an ATM. a Produce a use case diagram. b Produce appropriate class diagram(s). c Produce an activity diagram.
Use the diagram below to answer the following questions. B D 1 atm P 0.5 atm SO 150 250 350 T." According to the diagram, the solid phase of this substance OA) is more dense than the liquid phase. B) is less dense than water. C) is less dense than the liquid phase. D) has the same density as the liquid phase.
Create a use case diagram based on this sequence diagram. Assume (for the purpose of this Question 1.i only) that our task is to implement the AMS. [8 marks] Create a component diagram at type level, consistent with the sequence diagram. [12 marks] Detail the interfaces of the components as UML interfaces, including full operation signatures. [15 marks] Describe effect of the invocation true = checkln(card, reader) using textual pre and post conditions and a visual contract based on the...