QUESTION 10
Static budgeting |
||
Capital budgeting |
||
Flexible budgeting |
||
Strategic budgeting |
QUESTION 11
Is not constrained to the relevant range |
||
Eliminates the need for a master budget |
||
Is prepared before the master budget |
||
Is a series of static budgets at different levels of activity |
QUESTION 12
A firm is responsible for reporting to the public all activities that have a social impact, such as pollution control |
||
Each activity within a firm is controlled by a manager who is accountable for costs; costs and revenues; or costs, revenues, and investments, depending on the degree of responsibillity assigned |
||
A firm should apply generally accepted accounting principles on a basis consistent with preceding years |
||
A firm should be objective in accounting and should use historical costs rather than current-value concepts |
QUESTION 13
Revenue center |
||
Cost center |
||
Profit center |
||
Investment center |
QUESTION 14
EZ Sleep |
Pepeze |
|||
Selling price per 100 bottles |
$400 |
$600 |
||
Variable costs per 100 bottles |
$240 |
$200 |
||
Labor costs per 100 bottles |
10 |
20 |
||
$4,000 larger |
||||
$4,000 smaller |
||||
$6,000 larger |
||||
$6,000 smaller |
QUESTION 10 Which of the following types of budgeting procedures is the most effective for measuring...
10 Which of the following statements is true? activity is higher than expected total fixed costs should be higher than expected. I civity is lower than expected, total fixed costs should be lower than expected Fixed costs should not be included in a flexible budget because they do not change when the level of activity changes. C A revenue variance is favorable if the actual revenue is greater than the revenue in the master (static planning) budget. A spending variance...
QUESTION 16 Which of the following can be a problem with participative budgeting? Budget-based incentives lead to incorrect information about projected costs and sales (budgetary slack) being communicated to higher level management. All the other answers. Production budgets are established based on unrealistically low sales forecasts, leading to production being short of materials and labor. Conflicts of interest when lower level managers are evaluated by comparing actual results to the budget. 2 points QUESTION 17 Which component of the...
Question 3 1 pts Advantages of a flexible budget include all of these, EXCEPT: it is appropriate for fixed costs, but not variable costs. it is adaptable to changes in operating conditions it can be prepared for individual budgets in the Master Budget all of the above are advantages of a flexible budget Question 4 1pts An investment center manager would most likely have his/her performance evaluation based on: return on investment controllable margin. how well he/she was able to...
10 Which of the following statements is true? A f activity is higher than expected total expected, total fixed costs should be lower than expectes desta shehehe sts should be higher than expected. I activity is lower than than expected ked costs should not be included in a rsible budest because they do not change changes, lexible budget because they do not change when the level of activity A revenue variance is favorable if th i c hen ther e...
Managerial Accounting - Chapters 8, 9, & 10 Review Sheet Know definitions of terms. 1. What is the first step in budget preparation? 2. What are the benefits of budgeting? What is the format for determining budgeted production needs? What is the format for determining the budget raw materials that should be purchased? 4. If total costs of an account billing activity center is $250,000. Cost behavior analysis indicates that fixed costs are $50,000. Activity analysis indicates that the cost...
Please NOTE: There is a printing error in the textbook for Variable Overhead in the Master Budget Column, it should be (40,000) instead of (90,000) Use this format BELOW to tabulate your answers Evaluating Profit and Investment Center Performance P3.The managing partner of the law firm Sewell, Bagan, and Clark, LLP, makes asset acquisition and disposal decisions for the firm. As managing partner, she supervises the partners in charge of the firm's three branch offices. Those partners have the authority...
41. The budget process involves doing all of the following except A. executing plans to achieve the goals B. firing all managers who fail to achieve operational goals specified in the budget C. periodically comparing actual results with the goals D. establishing specific goals 42. The process of developing budget estimates by requiring all levels of management to estimate sales, production, and other operating data as though operations were being initiated for...
Camarillo Manufacturing Company was established to manufacture two types of pipe fittings, XL1 and XL2. The manufacturing process involves molding the fittings and then smoothing them. The firm was initially capitalized with $500,000 as an S Corporation. The firm purchased equipment for $450,000 with cash of $125,000 and a note payable of $325,000. It also acquired furniture for $120,000 with cash of $60,000 and a note payable of $60,000. Management is now preparing the master budget for the first year...
I need help with this question. Assume that The AM Bakery is preparing a budget for the month ending November 30. Management prepares the budget by starting with the actual results for August that is shown below. Then, management considers what the differences in costs will be between August and November THE AM BAKERY Bakery sales Actual and Budgeted Costs For the Month Ending August 31 Actual Ingredients Flour $ 3,980 Butter 3,580 011 1,940 Fruit 1,540 Nuts 980 Chocolate...
Several years ago, Westmont Corporation developed a comprehensive budgeting system for planning and control purposes. While departmental supervisors have been happy with the system, the factory manager has expressed considerable dissatisfaction with the information being generated by the system. A report for the company's Assembly Department for the month of March follows: Assembly Department Cost Report For the Month Ended March 31 Actual Planning Results Budget 25,000 30,000 Variances Machine-hours $ 6,000 $ 16,800 54,200 6,600 $ 600 F 18,000...