Problem 17-1A Comparing costs using ABC with the plantwide overhead rate LO P1, P3, A1, A2
The following data are for the two products produced by Tadros
Company.
Product A | Product B | ||||
Direct materials | $ | 20 per unit | $ | 25 per unit | |
Direct labor hours | 0.5 DLH per unit | 1.5 DLH per unit | |||
Machine hours | 0.4 MH per unit | 1.2 MH per unit | |||
Batches | 200 batches | 360 batches | |||
Volume | 16,000 units | 3,600 units | |||
Engineering modifications | 18 modifications | 82 modifications | |||
Number of customers | 500 customers | 400 customers | |||
Market price | $ | 55 per unit | $ | 220 per unit | |
The company's direct labor rate is $32 per direct labor hour (DLH).
Additional information follows.
Costs | Driver | |||
Indirect manufacturing | ||||
Engineering support | $ | 53,600 | Engineering modifications | |
Electricity | 42,880 | Machine hours | ||
Setup costs | 171,520 | Batches | ||
Nonmanufacturing | ||||
Customer service | 85,500 | Number of customers | ||
Required:
(Round your per unit cost answers to 2 decimal places and other
answers to nearest whole number. Loss amounts should be indicated
with minus sign.)
1. Compute the manufacturing cost per unit using the plantwide overhead rate based on direct labor hours.
1.2 What is the gross profit per unit?
2.1 How much gross profit is generated by each customer of Product A and Product B using the plantwide overhead rate?
2.2 What is the cost of providing customer service to each customer?
Is the gross profit adequate for each customer of Product A and B using the plantwide overhead rate?
3.1 Determine the manufacturing cost per unit of each product line using ABC.
3.2 What is the gross profit per unit?
4.1 How much gross profit is generated by each customer of Product A and Product B using ABC?
4.2 Is the gross profit adequate for each customer of Product A and B using ABC?
5. Which method of product costing gives better information to managers of this company?
Problem 17-1A Comparing costs using ABC with the plantwide overhead rate LO P1, P3, A1, A2...
Problem 17-1A Comparing costs using ABC with the plantwide overhead rate LO P1, P3, A1, A2 The following data are for the two products produced by Tadros Company Direct materials Direct labor hours Machine hours Batches Volume Engineering modifications Number of customers Market price Product A $14 per unit 8.6 DLH per unit 0.5 MH per unit 120 batches 10,000 units 10 modifications 500 customers $36 per unit Product B $28 per unit 1.5 DLH per unit 1.1 MH per...
Problem 17-1A Comparing costs using ABC with the plantwide overhead rate LO P1, P3, A1, A2 The following data are for the two products produced by Tadros Company Direct materials Direct labor hours Machine hours Batches Volume Engineering modifications Number of customers Market price Product $15 per unit 0.4 DLM per unit 0.3 per unit 115 batches 10,000 units 10 modifications 500 customers $35 per unit Products $28 per unit 1.6 DLH per unit 1.2 MH per unit 230 batches...
Problem 17-1A Comparing costs using ABC with the plantwide overhead rate LO P1, P3, A1, A2 The following data are for the two products produced by Tadros Company Direct materials Direct labor hours Machine hours Batches Volu Engineering modifications Number of customers Market price Product A $15 per unit 0.4 DLH per unit 2.3 MH per unit 115 batches 10,000 units 10 modifications 500 customers $35 per unit Product B 528 per unit 1.6 DLH per unit 1.2 per unit...
Problem 17-1A Comparing costs using ABC with the plantwide overhead rate LO P1, P3, A1, A2 The following data are for the two products produced by Tadros Company. Product A Product B Direct materials $ 15 per unit $ 24 per unit Direct labor hours 0.4 DLH per unit 1.4 DLH per unit Machine hours 0.3 MH per unit 1.0 MH per unit Batches 95 batches 190 batches Volume 10,000 units 2,000 units Engineering modifications 11 modifications 55 modifications Number...
Problem 17-1A Comparing costs using ABC with the plantwide overhead rate LO P1, P3, A1, A2 The following data are for the two products produced by Tadros Company. Product A Product B Direct materials $ 15 per unit $ 24 per unit Direct labor hours 0.3 DLH per unit 1.6 DLH per unit Machine hours 0.1 MH per unit 1.2 MH per unit Batches 125 batches 225 batches Volume 10,000 units 2,000 units Engineering modifications 12 modifications 58 modifications Number...
Need help correcting the answers in red. Problem 17-1A Comparing costs using ABC with the plantwide overhead rate LO P1, P3, A1, A2 The following data are for the two products produced by Tadros Company. Direct materials Direct labor hours Machine hours Batches Volume Engineering modifications Number of customers Market price Product A $15 per unit 0.5 DLH per unit 0.4 MH per unit 200 batches 16,000 units 14 modifications 700 customers $55 per unit Product B $30 per unit...
Need help correcting the answers in red Problem 17-1A Comparing costs using ABC with the plantwide overhead rate LO P1, P3, A1, A2 The following data are for the two products produced by Tadros Company. Direct materials Direct labor hours Machine hours Batches Volume Engineering modifications Number of customers Market price Product A $15 per unit 0.5 DLH per unit 0.4 MH per unit 200 batches 16,000 units 14 modifications 700 customers $55 per unit Product B $30 per unit...
please help!! need this done within the next 4 hours please help! Problem 17-1A Comparing costs using ABC with the plantwide overhead rate LO P1, P3, A1, A2 The following data are for the two products produced by Tadros Company Direct materials Direct labor hours Machine hours Batches Volume Engineering modifications Number of customers Market price Product A $15 per unit 0.5 DLH per unit 0.4 MH per unit 90 batches 10,000 units 10 modifications 500 customers $35 per unit...
The following data are for the two products produced by Tadros Company PROBLEM SETA Product A Product B Direct materials. Direct labor hours... Machine hours Batches Volume Engineering modifications .. Number of customers...... Market price..... $15 per unit 0.3 DLH per unit 0.1 MH per unit 125 batches 10,000 units 12 modifications 500 customers $30 per unit $24 per unit 1.6 DLH per unit 1.2 MH per unit 225 batches 2.000 units 58 modifications 400 customers $120 per unit Problem...
Labels for part 1 Customer service costs Direct labor costs Direct labor hours Direct materials Inspection hours Number of batches Number of customers Number of machine hours Number of modifications Number of parts Number of setups Overhead costs The following data are for the two products produced by Tadros Company. Direct materials Direct labor hours Machine hours Batches Volume Engineering modifications Number of customers Market price Product A $15 per unit 0.3 DLH per unit 0.2 MH per unit 115...