Furniture Face Lift refinishes old wood furniture. Their process for refinishing chairs has 8 workers and 4 stations. Each ch
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Capacity = Staffing / Activity Time

* Stripping = 3/2.5 =1.2

* Priming = 2/1.5 = 1.33

* Painting = 2/1 = 2

* Inspection = 1/0.8 = 1.25

Here , Stripping would be the bottleneck since it has the lowest capacity

So, Process Capacity = 1.2 chairs/hour

Take almost (2.5+1.5+1+0.8) =5.8 hours for the first chair to be produced. It takes 1/1.2 hours for each of the subsequent chairs.

In total it takes  [5.8 + (1/1.2*17)] =19.96 hours to complete 18 chairs.

Ans :- 19.96 hours

Add a comment
Know the answer?
Add Answer to:
Furniture Face Lift refinishes old wood furniture. Their process for refinishing chairs has 8 workers and...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 4. Furniture Face Lift (15 points) Furniture Face Lift refinishes old wood furniture. Their process for...

    4. Furniture Face Lift (15 points) Furniture Face Lift refinishes old wood furniture. Their process for refinishing chairs has 10 workers and 4 stations. Each chair starts at the Stripping station, then goes to Priming, then to Painting and finally to Inspection. Where there are multiple workers within a station, each worker works independently on his/her own chair. Assume inventory buffers are allowed between each station. Station Staffing 4 Processing time (hours per chair per worker) 2.4 1.6 1.72 0.92...

  • Furniture Face Lift refinishes old wood furniture.

    Furniture Face Lift refinishes old wood furniture. Their process for refinishing chairs has 8 workers and 4 stations. Each chair starts at the Stripping station, then goes to Priming, then to Painting and finally to Inspection. Where there are multiple workers within a station, each worker works Independently on his her own chair. Assume inventory buffers are allowed between each station. StationStaffingProcessing time (hours per ohair per worker)Stripping32.5Priming21.5Paining22Inspocton10.8Suppose at the start of the day there is no inventory of Chairs in...

  • Casa Migliore is a production company that manufactures high quality furniture. The manager of Casa Migliore...

    Casa Migliore is a production company that manufactures high quality furniture. The manager of Casa Migliore has realized the opportunity to increase the revenues by reducing the costs related to production and inventory levels. He now wants to optimize the production planning of three types of chairs, A, B, and C for the next 6 months. In Table 1, sales forecasts for each type of chair are given. Table 1. Demand for each type of chair for the next 6...

  • Summary should briefly analyze the central problems and issues of the case and provide some analysis...

    Summary should briefly analyze the central problems and issues of the case and provide some analysis and suggestions. Thank you. Lean Initiatives and Growth at Orlando Metering Company It was late August 2002 and Ed Cucinelli, vice president of Orlando Metering Company (OMC), sat in his office on a late Saturday morning. He had come in to prepare for some strategic planning meetings that were scheduled for the upcoming week. As he noticed the uncommon silence in the building, Ed...

  • In your judgement, and given only the facts described in this case, should the management of...

    In your judgement, and given only the facts described in this case, should the management of Massey energy Company be held morally responsible for the deaths of the 29 miners? Explain in detail. Suppose that nothing more is learned about the explosion other than what is described in this case. Do you think Don Blankership should be held morally responsible for the deaths of the 29 miners? Explain in detail. Given only the facts described in this case, should the...

  • 10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated...

    10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT