Question

Problem 2 [22 Points, 2 Each] The figure below shows a plate with flatness applied to the top surface. The thickness of the p
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Given :- Thickness of the plate Plate = 1.750 t o.oos Flatness allowance 0.002 0.002 1.750F 0.005 To find : Allowable form To(MML- Actual size) + Form Tolerance fom Tolerance = (1.755-1.755)+0.002 :. For, actual size = 1.745 Allowable Form Tolerance

Add a comment
Know the answer?
Add Answer to:
Problem 2 [22 Points, 2 Each] The figure below shows a plate with flatness applied to...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Problem 1. Electrostatics (1) As shown in the Figure below, a parallel-plate capacitor of plate area A is filled with two layers of dielectrics, ch and d2 thick, with permittivities fringe effect...

    Problem 1. Electrostatics (1) As shown in the Figure below, a parallel-plate capacitor of plate area A is filled with two layers of dielectrics, ch and d2 thick, with permittivities fringe effect at the four edges (assuming rectangular plates), find the fields Ei and Es in the two dielectrics if a voltage V (assumed positive) is applied to the top plate with regard to the bottom plate. (Note: both magnitudes and directions needed.) and a, respectively. Ignoring the (2) Find...

  • (1) As shown in the Figure below, a parallel-plate capacitor of plate area A is filled with two laye ers of dielectrics, di and de thick, with permittivities s and s2, respectively. Ignoring the r...

    (1) As shown in the Figure below, a parallel-plate capacitor of plate area A is filled with two laye ers of dielectrics, di and de thick, with permittivities s and s2, respectively. Ignoring the ringe effect at the four edges (assuming rectangular plates), find the fields Ei and E2 in the t dielectric ctrics if a voltage V(assumed positive) is applied to the top plate with regard to the bottom plate. (Note: both magnitudes and directions needed.) (2) Find the...

  • Problem 4 (25 points) The figure below shows a mass spectrometer, a device used to measure...

    Problem 4 (25 points) The figure below shows a mass spectrometer, a device used to measure the masses of ions. Consider a positive ion of unknown mass m and charge q = 3.2 x 10-19 C. The ion is first accelerated from rest through a potential difference of magnitude 1v1 = 750 V inside a source. After leaving the source, it travels upward at constant speed and enters a region of uniform magnetic field B = 2.5 T directed out...

  • Problem 4: Read Appendix 2 below (Sec. 1.4.1 of Kasap) and then solve. A metallic back...

    Problem 4: Read Appendix 2 below (Sec. 1.4.1 of Kasap) and then solve. A metallic back contact is applied to the CdTe solar cell of Problem 1 using a set up similar to that described in Figure 1.74 (b) on the next page. To form the metallic back contact, two evaporation sources are used, Cu and Au. An initial 3 nm layer of Cu is deposited first and then 30 nm of Au is deposited. After these depositions, the sample...

  • pleas help me in this do any question you know using National Electrical Code 2011 Applied Electricity NEC...

    pleas help me in this do any question you know using National Electrical Code 2011 Applied Electricity NEC worksheet t hree Copper conductors with THHN insulation run in Electrical A branch-circuit Consther conductors. The conductor terminations are rated for a maximum ure in the area of this installation is not expected to exceed 30C size 8 AWG, the maximum ampacity of the conductors If the conductors for this circuit are permitted A 40 amperes. B. 50 amperes. to be used...

  • Notes for lab dc02-Resistors and the Color Code will skip are Part 2 e, g: Part 4; Exercises 2, 4,5,6 an...

    Notes for lab dc02-Resistors and the Color Code will skip are Part 2 e, g: Part 4; Exercises 2, 4,5,6 and 3. It is important to answer the exercises correctly in each labl you should include the appropriate prefix for the unit in the Numerical Value We will not be Volt using the Volt-Ohm meter (VOM) for this lab, so skip the parts that ask for VOM measurements. The parts we You do need to complete Exercises1 Note that in...

  • summatize the following info and break them into differeng key points. write them in yojr own...

    summatize the following info and break them into differeng key points. write them in yojr own words   apartus 6.1 Introduction—The design of a successful hot box appa- ratus is influenced by many factors. Before beginning the design of an apparatus meeting this standard, the designer shall review the discussion on the limitations and accuracy, Section 13, discussions of the energy flows in a hot box, Annex A2, the metering box wall loss flow, Annex A3, and flanking loss, Annex...

  • summarizr the followung info and write them in your own words and break them into different...

    summarizr the followung info and write them in your own words and break them into different key points.   6.5 Metering Chamber: 6.5.1 The minimum size of the metering box is governed by the metering area required to obtain a representative test area for the specimen (see 7.2) and for maintenance of reasonable test accuracy. For example, for specimens incorporating air spaces or stud spaces, the metering area shall span an integral number of spaces (see 5.5). The depth of...

  • 10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated...

    10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...

  • How can we assess whether a project is a success or a failure? This case presents...

    How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT