Part B:
The municipal mill rate in the neighbourhood is 22.375 mills. There is an educational mill rate of 11.35 mills.
The following list is the municipalities planned local improvement costs for the next 25 years in that neighbourhood:
Boulevard reconstruction costs $4.25/foot
Water renewal costs $1.90/foot
Concrete street paving costs $2.65/foot
Land drainage system costs $6.10/foot
Find the total cost of the property taxes over the amortization period chosen.
Calculation of total cost:
Particulars | Amount |
Municipal mill rate | 22.375 |
Educational mill rate | 11.35 |
Total Mill Rate (A) | 33.725 |
Boulevard reconstruction costs | 4.25 |
Water renewal costs | 1.9 |
Concrete street paving costs | 2.65 |
Land drainage system costs | 6.1 |
Total cost (B) | 14.9 |
Cost for property tax (A-B) | 18.825 |
Part B: The municipal mill rate in the neighbourhood is 22.375 mills. There is an educational...
adwith that option. Part B: The municipal mill rate in the neighbourhood is 22.375 mills. There is an educational mill rate of 11.35 mills. The following list is the municipalities planned local improvement costs for the next 25 years in that neighbourhood: Boulevard Reconstruction Water Renewal Concrete Street Paving Land Drainage System 2020 2025 2030 2035 2010 Boulevard reconstruction costs $4.25/foot Water renewal costs $1.90/foot Concrete street paving costs $2.65/foot Land drainage system costs $6.10/foot 2015 . Find the total...