What does an economic order quantity, or EOQ and the total cost formula tell management? What is the reorder point?
What does an economic order quantity, or EOQ and the total cost formula tell management? What...
Which one of the following is incorrect? 1) The formula for the EOQ (Economic Order Quantity) is the square root of a fraction, whose numerator is twice the product of the annual item demand and the cost per order, and whose denominator is the product of the unit price and the annual carrying rate. 2) Annual ordering cost is the EOQ multiplied by variable ordering cost. 3) Average inventory on hand is the order size multiplied by half. 4) Annual...
A product with an annual demand of 1000 units has EOQ (Economic Order Quantity) = 80. The demand during the lead time follows a normal probability distribution with µ = 25 and ϭ =5 during the reorder period. How much safety stock is required, if the firm desires at most a 2% probability of a stockout on any given order cycle? If a manager sets the reorder point at 30, what is the probability of a stockout on any given...
Jony furniture store examines its inventory policy and considers using an economic order quantity (EOQ) approach. They have the following information about a table set: Annual demand Current order quantity Carrying cost Order cost 3,920 sets 80 sets $80.00/set/year $200 a. What is the current total annual cost (TC)? (5 points) b. What is the economic order quantity (EOQ)? [5 points) c. What is the total annual cost at the economic order quantity (EOQ)? [5 points)
3. Calculate the total cost of Orueng all calling utullu P2-2 Economic Order Quantity; Ordering and Carrying Costs LO1 Mayer, Inc. predicts it will use 63,000 units of material during the year. The expected daily usage is 500 units, and there is an expected lead time of five days and a desired safety stock of 1,500 units. The material is expected to cost $5 per unit. Mayer anticipates it will cost $194.45 to place each order. The annual carrying cost...
please read before solving thanks A products with an annual demand of 1000 units has EOQ (Economic Order Quantity)- 80. The demand during the lead time follows a normal probability distribution with u- 25 and s-5 during the reorder period. a How much safety stock is required, if the firm desires at most a 2% probability of a 4. stockout on any given order cycle? b. If a manager sets the reorder point at 30, what is the probability of...
1) What is the order quantity to minimize total cost or EOQ, given the information in the Excel sheet? 2) Graph the problem. B н 1 Quantity Discounts EOQ 2 Categories Feasible Range O to 200 Item Cost, C % Discount 3 100 4 200 to 800 3 97 800 or more 3 94 D= 2025 items/year Co= $/order 60 $/SC/year 8 Cc= 0.3 11 12 13 14 15 16 17 18 19 20 22 23 24 25 26 27
What two costs are involved when calculating economic order quantity (EOQ)? Why might it make sense to apply the “80/20 rule” to inventory management? What are some options of dealing with dead inventory? plz put number in front of the answers.
EOQ, reorder point, and safety stock Alexis Company uses 631 units of a product per year on a continuous basis. The product has a fixed cost of $41 per order, and its carrying cost is $4 per unit per year. It takes 5 days to receive a shipment after an order is placed, and the firm wishes to hold 10 days' usage in inventory as a safety stock. a. Calculate the EOQ. b. Determine the average level of inventory. (Note:...
EOQ, reorder point, and safety stock Alexis Company uses 805 units of a product per year on a continuous basis. The product has a fixed cost of $50 per order, and its carrying cost is $4 per unit per year. It takes 5 days to receive a shipment after an order is placed, and the firm wishes to hold 10 days' usage in inventory as a safety stock. a. Calculate the EOQ. b. Determine the average level of inventory. (Note:...
EOQ, reorder point, and safety stock Alexis Company uses 907 units of a product per year on a continuous basis. The product has a fixed cost of $57 per order, and its carrying cost is $5 per unit per year It takes 5 days to receive a shipment after an order is placed, and the firm wishes to hold 10 days' usage in inventory as a safety stock. a. Calculate the EOQ. b. Determine the average level of inventory. (Note:...