Based on Examples 1 and 3 in the lecture note, the amount of concrete poured, rebar, and form used in continuous footings and foundation wall can be estimated. Show all your calculations by sending Excel file or hand calculation via Folio email.
Determine the amount of rebar needed for the continuous footing shown in Figure above. Allow for two inches of cover. Add 10 percent for lap and waste to the continuous bars.
#5 Dowel bar ( ) pounds
#4 Rebar @ 12” O.C ( ) pounds
#4 Continuous rebar ( ) pounds (apply waste factor for lap)
Total pounds ( )
Tons ( )
Question 18 options:
Total pounds ( 3465 ) Tons ( 1.73 ) |
|
Total pounds ( 1498 ) Tons ( 0.75 ) |
|
Total pounds ( 1898 ) Tons ( 0.949 ) |
|
Total pounds ( 3465 ) Tons ( 3.45 ) |
Hi,
Solution as follows:
Data Given,
Center line length method is a quick and accurate method to work out quantities of uniform size continuous footings, walls etc.
Center line length = 2 x 40 + 2 x 26 – 4 x 3 = 120 ft
Data Given,
Concrete quantity in footing = 120 x 3 x 1.25 = 450 ft3
Concrete quantity in wall = 120 x 1 x 12 = 1440 ft3
Total = 450 + 1440 = 1890 ft3
Data Given,
Forms will be required at both faces of walls and footings.
Forms quantity in footing = 2 x 120 x 1.25 = 300 ft2
Concrete quantity in wall =2 x 120 x 12 = 2880 ft2
Total = 300 + 2880 = 3180 ft2
Rebar Quantity calculated below:
TABLE 1 : REBAR SCHEDULE |
|||||||||
Sl. No. |
Particulars |
Bar No. |
Total Nos. |
Total Length (ft) |
Unit Wt (lbs per ft.) |
Total Weight (lbs) |
Waste |
Total Weight i.c. waste (lbs) |
Total Weight (ton) |
Total Length of Footing = 120 feet |
|||||||||
1 |
Dowel Bars (1'+2'4") - #5@12" O.C. alternate |
#5 |
242 |
3.33 |
1.043 |
841 |
841 |
0.421 |
|
2 |
Footing Short rebar (#4@12" O.C.) |
#4 |
121 |
2.67 |
0.668 |
216 |
216 |
0.108 |
|
3 |
Footing Long rebar |
#4 |
5 |
120.00 |
0.668 |
401 |
10% |
441 |
0.221 |
Total (lbs) |
1,457 |
1,498 |
0.75 |