Given: A -3.85% grade meets a -2.90% grade at station 41+25 (VPI). The EVC elevation 227.49...

Given: A -3.85% grade meets a -2.90% grade at station 41+25 (VPI). The EVC elevation 227.49 ft. The length is 550’. Calculate the full (+00) stations on the curve.
0 0
Add a comment Improve this question Transcribed image text
Answer #1

C OE 100 J.-9, = 2.Gut 3.85 +0.952 Ele (PVC) = Ele(Eve) - (9+) = 227.49-(-2.9–3,85 x 550 ce Eve Xo = 246.05 Sta(PVC)= No = s

Add a comment
Know the answer?
Add Answer to:
Given: A -3.85% grade meets a -2.90% grade at station 41+25 (VPI). The EVC elevation 227.49...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 3. A 300 ft vertical curve connects a-2.3% approach grade and a +1.6% departure grade. The PVI is...

    3. A 300 ft vertical curve connects a-2.3% approach grade and a +1.6% departure grade. The PVI is at 45+65 with elevation 369.22'. The curve is designed for 35 mi/hr speed limit. Calculate stations and elevations for PVC and PVT A 4% grade meets a failing grade of-25%. Station at P1 is at 60+00 and elevation is 95 feet. The length between PVC and PVT is 1400 feet. Find the elevation of the curve at station 58+00 4. 3. A...

  • A grade of -2.353% intersects a grade of -1.212% at station 77+70 whose elevation is 412.85...

    A grade of -2.353% intersects a grade of -1.212% at station 77+70 whose elevation is 412.85 feet, the distance back to the BVC is 600 feet, and the distance to the EVC is 450 feet. Compute the elevations of the full stations on this unequal length vertical curve. I am having a very hard time visualizing this but a diagram might help if possible!

  • Problem 4 A 500 ft long sag vertical curve passes under a bridge at station 82+45....

    Problem 4 A 500 ft long sag vertical curve passes under a bridge at station 82+45. The beginning of vertical curve (BVC) is at station 81+00. A-3.6% curve meets a +4.4% curve at the point of vertical intersection (PVI), which is at elevation 425.38 ft. What is the elevation of the point on the curve under the bridge? Problem 5 The grade into a vertical sag curve is -2%. The curve length is 1,400 ft. The grade out of the...

  • 1. (35 pts) A-2% grade intersects with a +3% grade at station 410+50.00 at an elevation of 200 fe...

    1. (35 pts) A-2% grade intersects with a +3% grade at station 410+50.00 at an elevation of 200 feet. If the speed limit is 70 mph, determine: a. b. C. d. Minimum length of vertical curve Stations and elevations of PVC and PVT Station and elevation of highpoint Create a spreadsheet that calculated the elevation of each 100 feet station and graph the curve. 1. (35 pts) A-2% grade intersects with a +3% grade at station 410+50.00 at an elevation...

  • There should be seven different elevations for the answer Problem 25.8 3 of 5 > A...

    There should be seven different elevations for the answer Problem 25.8 3 of 5 > A 530-ft curve, g,--1.00%, g,-+4.90%, VPI stations 46+00, VPI elevation 1350.00 ft, stakeout at full stations. Part A Tabulate station elevations for an equal-tangent parabolic curve for the data given above. Express your answers, separated by commas, to six significant figures. from lowest to highest elevation. ft, ft, ft, ft, ft, ft, ft Submit Request Answer

  • 2. Given a sag vertical curve connecting a -1.5% grade with a +2.5% grade on a...

    2. Given a sag vertical curve connecting a -1.5% grade with a +2.5% grade on a rural arterial highway, use the rate of vertical curvature and a design speed of 70 mi/h to compute the elevation of the curve at 100 ft stations if the grades intersect at station (475+00) at an elevation of 300.00 ft. Identify the station and elevation of the low point.

  • A crest vertical curve connects a +2% grade and a -2.05% grade. The PVI is at...

    A crest vertical curve connects a +2% grade and a -2.05% grade. The PVI is at station 40+00.00 at an elevation of 100.00 ft. The design speed is 70 mi/h. If the length is 1084 ft, determine: (b) The station of the BVC (3 pts (c) The elevation of the BVC (3 pts (d) The station of the EVC (3 pts) (e) The elevation of the EVC (3 pts) (1) The station of the highest point on the curve (4...

  • 9:381 LTE Problem 1 A crest vertical curve is to be designed to join a +2% grade with a-2% at a s...

    9:381 LTE Problem 1 A crest vertical curve is to be designed to join a +2% grade with a-2% at a section of a two-lane highway. Determine the minimum length of the curve if the design speed of the highway is 60 mph and SL. Assume that a-9.34 ftsec' and that the perception-reaction time is 2.5 sec. Problem2 A crest vertical curve is to be designed to join a +3% grade with a-2% grade at a section of a two-lane...

  • Q1. A +2 percent grade on an arterial highway intersects with a -1 percent grade at...

    Q1. A +2 percent grade on an arterial highway intersects with a -1 percent grade at station (5+357.28) at an elevation of 90m. If the design speed of the highway is 100 Km/h, determine the stations and elevations of the BVC and EVC, the elevation of each 30-m station, and the higlh point Q2. Determine the minimum length of a vertical curve if the grades are +4% and-200. Design speed is 120 km/hr. State assumptions used in solving this problem....

  • Geomatics 3. Field conditions require a highway curve to pass through a fixed point with elevation...

    Geomatics 3. Field conditions require a highway curve to pass through a fixed point with elevation 753.00 at station 30+00. Compute a suitable equal tangent vertical curve and full-station elevations if g!--2.50%, g2 +1.00%, VPI elevation- 750.00 ft, VPI station 30+00. Include a hand sketch of the curve.

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT