Question

CLASSIFICATION SHEAR STRENGTH LOCATION: See Plate 2 COORDINATES: N 29.499981 W 95.262789 Triaxial VaneMinisture VaneA SURFACE EL: No | |の KIPS PER SQ FT STRATUM DESCRIPTION 05 1.0 15 2.0 25 SILTY CLAY, firm to stiff, dark gray 25 39 13 26 with calcareous nodules, 2 to 6 gray and tan below3 stiff, with sand pockets and ferrous nodules below 22 55 12 43 20 109 8.0 SANDY SILT, medium dense, gray and tan with sand pockets and ferrous nodules to 10 10 12 56 12.5 tan 10 with clay seams to 14 15 10 20 31- dense, with day seams at 24 25 27.0 CLAY, very stiff, red 30 35 DATE: December 16, 2009 TOTAL DEPTH: 30 CAVED DEPTH: 9 DRY AUGER: Surface to 12 WET ROTARY: 12 to 25 BACKFILL: Cement-Bentonite Grout LOGGER: E. Schulak . Water First Noticed. X: Depth To Water after 20 minutes. 2. Terms and symbols defined on Plates 10a and 10b Figure la. Boring log for Problem 6

0 0
Add a comment Improve this question Transcribed image text
Answer #1

a. total depth of boring was 30 feet

b. wet rotary drilling method was used fron12' to 25'

c. thin walled sampler

d. Water was first noticed 12 feet below ground surface. After 20 minutes the water level was at 5 feet 6 inches below ground level.

e. Split tube sampler was used to collect sample at 24 feet.

N60= Nx ERr / 60 , for safety hammer ERr / 60 = 0.92 and at 24 ft N = 31 BLOW PER feet

So N = 31X 2 = 62

Hence N60= 62 x 0.92 = 5.704

Add a comment
Know the answer?
Add Answer to:
CLASSIFICATION SHEAR STRENGTH LOCATION: See Plate 2 COORDINATES: N 29.499981 W 95.262789 Triaxial VaneMinisture VaneA SURFACE...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 3. A soil boring was drilled in a multi-layered deposit, as shown in the boring log...

    3. A soil boring was drilled in a multi-layered deposit, as shown in the boring log below. A SPT was also performed at intervals of 1 m. A donut hammer and a liner sampler were used. Care was taken to connect the rod segments firmly and to follow standard procedure. a. Find the corrected Noo at the depths of 9 and 27 feet. b. What is the (N;) at the depth of 13 feet? c. Estimate the drained friction angle...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT