1) Calculation of total budgeted manufacturing overhead cost for upcoming year is shown as follows:-
Kane Corporation
Total Budgeted Indirect Manufacturing Costs (Amounts in $)
Activity | Budgeted Quantity of Cost Allocation Base (A) | Activity Cost Allocation Rate (B) | Total Budgeted Indirect Cost (A*B) |
Materials handling | 14,000 parts [(6.0*1,000)+(8.0*1,000)] | $5.50 per part | 77,000 |
Machine setups | 40 setups (20+20) | $325 per setup | 13,000 |
Insertion of parts | 14,000 parts [(6.0*1,000)+(8.0*1,000)] | $24 per part | 336,000 |
Finishing | 4,000 hours [(1.0*1,000)+(3.0*1,000)] | $57 per hour | 228,000 |
Total budgeted indirect cost | 654,000 |
2) Calculation of manufacturing overhead cost per wheel (Amounts in $)
Kane Corporation | |||||
ABC Indirect Manufacturing Cost per Unit | |||||
Activity | Cost Allocation Rate (a) | Quantity of Cost Allocation Base Used By: | Allocated Activity Cost per Wheel | ||
Standard (b) | Deluxe (c) | Standard (a*b) | Deluxe (a*c) | ||
Materials handling | $5.50 per part | 6.0 part per wheel | 8.0 part per wheel | 33 | 44 |
Machine setup | $325 per setup | 0.02 ($20/1,000 wheels) | 0.02 ($20/1,000 wheels) | 6.5 | 6.5 |
Insertion of parts | $24 per part | 6.0 part per wheel | 8.0 part per wheel | 144 | 192 |
Finishing | $57 per hour | 1.0 hr per wheel | 3.0 hr per wheel | 57 | 171 |
Total ABC Allocated indirect cost | 240.5 | 413.5 |
Note:- Quantity of Machine setup base is given for 1,000 wheel, hence divided by 1,000 for calculating setup per wheel. (i.e. 20 setups for 1,000 wheels, 0.02 setup for 1 wheel).
3) Plant wide Overhead rate = Total Estimated indirect cost/Total Direct labor hours
Total Direct labor hours = (2.6 hrs*1,000 wheels of Standard)+(3.4 hrs*1,000 wheels of Deluxe)
= 2,600+3,400 = 6,000 labor hours
Plant wide Overhead rate = $654,000/6,000 labor hours = $109 per hour
Therefore, the plant wide overhead rate is $109 per direct labor hour.
Calculation of overhead cost per wheel
Direct Labor hour per wheel | X | Plant wide Overhead rate per DL | = | Manufacturing Overhead | |
Standard | 2.6 DLHs | X | $109 | = | $283.4 per wheel |
Deluxe | 3.4 DLHs | X | $109 | = | $370.6 per wheel |
Several years after reengineering its production process, Kane Corporation hired a new controller, Christine Erickson. i...
Several years after reengineering its production process, Biltmore Corporation hired a new controller, Tammy English. For the upcoming year, Biltmore's budgeted ABC manufacturing overhead allocation rates are as follows: The number of parts is now a feasible allocation base because Biltmore recently installed a plantwide computer system. Biltmore produces two wheel models: Standard and Deluxe. Budgeted data for the upcoming year are as follows: Requirement 1. Compute the total budgeted manufacturing overhead cost for the upcoming year. Requirement 2....
Several years after reengineering its production process, Zeke Corporation hired a new controller, Barb Joe. a (Click the icon to view additional information.) The number of parts is now a feasible allocation base because Zeke recently installed a plantwide computer system. Zeke produces two wheel models: Standard and Deluxe. Budgeted data for the upcoming year are as follows: (Click the icon to view the additional data.) For the upcoming year, Zeke's budgeted ABC manufacturing overhead allocation rates are as follows:...
Several years after reengineering its production process, Zeke Corporation hired a new controller, Barb Joe. (Click the icon to view additional information.) The number of parts is now a feasible allocation base because Zeke recently installed a plantwide computer system. Zeke produces two wheel models: Standard and Deluxe. Budgeted data for the upcoming year are as follows: (Click the icon to view the additional data.) For the upcoming year, Zeke's budgeted ABC manufacturing overhead allocation rates are as follows: -...
Several years after reengineering its production process, King Corporation hired a new controller, Rachael Johnson. (Click the icon to view additional information.) The number of parts is now a feasible allocation base because King recently installed a plantwide computer system. King produces two wheel models: Standard and Deluxe. Budgeted data for the upcoming year are as follows: (Click the icon to view the additional data.) For the upcoming year, King's budgeted ABC manufacturing overhead allocation rates are as follows: (Click...
11. Several years after reengineering its production process, Zippy Corporation hired a new controller. Denise French (Click the icon to view additional information.) For the upcoming year, Zippy's budgeted ABC manufacturing overhead allocation rates are as follows: 2(Click the icon to view the additional data.) The number of parts is now a feasible allocation base because Zippy recently installed a plantwide computer system. Zippy produces two wheel models: Standard and Deluxe. Budgeted data for the upcoming year are as follows:...
PLEASE PLEASE PLEASE HELP ME! Several years after reengineering its production process, Zeke Corporation hired a new controller, Alice Brown. She developed an ABC system very similar to the one used by Zeke's chief rival. Part of the reason Brown developed the ABC system was because Zeke's profits had been declining even though the company had shifted its product mix toward the product that had appeared most profitable under the old system. Before adopting the new ABC system, the company...
Several years after reengineering its production process, Biltmore Corporation hired a new controller, Georgia Taylor. She developed an ABC system very similar to the one used by Biltmore's chief rival. Part of the reason Taylor developed the ABC system was because Biltmore's profits had been declining even though the company had shifted its product mix toward the product that had appeared most profitable under the old system. Before adopting the new ABC system, the company had used a plantwide overhead...
Several years after reengineering its production process, Biltmore Corporation hired a new controller, Tammy English. (Click the icon to view additional information.) The number of parts is now a feasible allocation base because Biltmore recently installed a plantwide computer system. Biltmore produces two wheel models: Stan (Click the icon to view the additional d A Data Table For the upcoming year, Biltmore's budgeted ABC manufacturing overhead allocation rates are as follows: E: (Click the icon to view the additional data.)...
Several years after reengineering its production process, King Corporation hired a The number of parts is now a feasible allocation base because King recently installed new controller, Alice Brown. a plantwide computer system. King produces two wheel models: Standard and (Click the icon to view additional information.) Deluxe. Budgeted data for the upcoming year are as follows: (Click the loon to view the additional data.) For the upcoming year, King's budgeted ABC manufacturing overhead allocation rates are as follows: (Click...
Several years after reengineering is production process. Trudell Corporation hired a new controller Ashley Adams (Click the icon to view additional Information) For the upcoming your, Trudel's budgeted ABC manufacturing overhead allocation rates are as follows: m (Click the icon to view the additional data.) The number of parts is now a feasible allocation base because Trudell recently installed a planwide computer stem. Trudel produces to wheel models. Standard and Deluxe Budgeted data for the upcoming year are as follows:...