If 500 compacted cubic yards in-place of sand/gravel is required, how many loads would be required?...
If 1000 compacted cubic yards in-place of sand/gravel is
required, how many loads would be required? The material has an
average percent swell and an average percent shrinkage. Refer to
the table in the lecture note to figure out the swell percent and
shrinkage percent.
Percentage of Swell& Shrinkage Shrinkage Swell Material Sand and Gravel 10 to 18% 85 to 100% 90 to 100% Loam 15 to 25% Dense Clay 20 to 35% 90 to 100% Solid Rock 40 to...