19. Two cross sections, A and B, are 7.0 km apart along a 0.90-m-diameter commercial steel pipe in its best condition. A is 8
please solve problem in detail including needed FBD
0 0
Add a comment Improve this question Transcribed image text
Answer #1

wb.ozp 7000 m Given length of pipe la 7000 m dia of pipe dao.am ZA-7B = 83.5 m pressure heade PA = 12.3m o=88.7m es velocitypor commercial steel pipes - 5 6 6 5 ๓๑z S + 02S X 10 - - - 0 6 In 10210 - 4 2 5 | Qob 666 ง 3 33 X - 4 0 % ง 36 = 0 (38 ร จ.

Add a comment
Know the answer?
Add Answer to:
please solve problem in detail including needed FBD 19. Two cross sections, A and B, are...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • please solve 25 in detail 24. Water is flowing through a 7500-m long, 0.90-m diameter commercial...

    please solve 25 in detail 24. Water is flowing through a 7500-m long, 0.90-m diameter commercial steel pipe in its best condition. At the upstream end of the pipe, the elevation head is 83.5 m and the pressure head is 12.3m. At the downstream end of the pipe, the elevation head is 0 m and the pressure head is 88.7 m. Use the Hazen Williams equation to solve for the flow rate in this pipe. Answer: Q = 0.73 m2/s....

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT