Question

A preventive maintenance program has been conducted to replace a polymer gear with a required functional...

A preventive maintenance program has been conducted to replace a polymer gear with a required functional stress level of 20 MPa every two years. The polymer material was tested to have an initial stress of 36 MPa, which was dropped to 30 MPa after a year usage at a constant strain. Provide your engineering reasoning whether the maintenance program for the polymer gear with respect to reliability and cost is correct or not.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

bata from the girco question 60 = 36mpa - 30 mpa t =1 (12 months we know year 4) GoC - 0 where 6 = stress impa) Go - Original(-24166) 20 - Gà C (-0.3636) 20 - 60 C 20 =GO - (-0.3636) e 20 0.695 28.77 :: Go = 28.79 mpa initial stress 93 still mainted

Add a comment
Know the answer?
Add Answer to:
A preventive maintenance program has been conducted to replace a polymer gear with a required functional...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Summary should briefly analyze the central problems and issues of the case and provide some analysis...

    Summary should briefly analyze the central problems and issues of the case and provide some analysis and suggestions. Thank you. Lean Initiatives and Growth at Orlando Metering Company It was late August 2002 and Ed Cucinelli, vice president of Orlando Metering Company (OMC), sat in his office on a late Saturday morning. He had come in to prepare for some strategic planning meetings that were scheduled for the upcoming week. As he noticed the uncommon silence in the building, Ed...

  • How can we assess whether a project is a success or a failure? This case presents...

    How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...

  • 10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated...

    10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT